Modern Mining ›› 2024, Vol. 40 ›› Issue (02): 92-95.
Previous Articles Next Articles
Tailings mining is an effective way to improve the utilization rate of mineral resources,and disasters such as landslides and dam breaks occur frequently in the project of closing the tailing pond. In or⁃ der to explore the efficient and economical mining method and safety,taking the closing the tailing pond project in a rainy and humid area as an example,the scheme design is carried out through analyzing the technical conditions,and the stability analysis is carried out based on numerical simulation. The results show that the combined stoping process of dry stoping in front of the dam and wet stoping in the reservoir should be adopted. The stoping sequence is carried out according to the principles of from inside to outside, from reservoir to dam,from top to bottom and single-layer mining. The stability of the dam body meets the safety requirements during the stoping process.
Online:
Published:
Abstract:
Key words: mining of closing the tailing pond, dam stability, outside row mining scheme
ZHANG Zhonghua, ZENG Xiaoxiang, LIU Tao, CAO Qiguang, GUO Guoxiao YING Qinghai, .
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.xdky.net/EN/
https://www.xdky.net/EN/Y2024/V40/I02/92