改性二水磷石膏井下充填采空区工业试验及环境安全评价

石 亮 杨广通 张 剑 张千俊   

  1. 德阳昊华清平磷矿有限公司
  • 出版日期:2026-09-25 发布日期:2026-10-10

Industrial Test and Environmental Safety Evaluation of Underground Goaf Filling with Modified Dihydrate Phosphogypsum

SHI Liang YANG Guangtong ZHANG Jian ZHANG Qianjun   

  1. Deyang Haohua Qingping Phosphate Mine Co.,Ltd.
  • Online:2026-09-25 Published:2026-10-10

摘要: 针对磷石膏大规模堆存引发的环境污染问题及矿山采空区地质灾害隐患,依托清平磷 矿工程实际,开展改性二水磷石膏井下充填配比优化与现场工业试验研究。以磷石膏为主料,复配 粉煤灰、生石灰及专用外加剂优化充填配比,通过力学性能测试、毒性浸出试验、挡墙力学验算及全 域水环境全过程监测,系统验证该充填技术的工程适用性与环境安全性。试验结果表明:优化配比 的改性磷石膏充填体工作性能优良,可实现井下自流输送,28 d抗压强度达6.19 MPa,满足矿山充填 支护设计要求。改性体系可有效固化磷、氟等有害离子,充填体氟化物、磷酸盐浸出浓度分别为 0.604,0.04 mg/L,达到Ⅰ类一般工业固体废物标准,环境相容性良好。现场工业试验与水质监测证实, 分层充填施工工艺安全可靠,充填作业未对区域地下水、地表水环境造成不良影响。经济效益分析 显示,相较于传统砂石充填工艺,该技术可节约充填成本 2 549.4万元/a,可规模化消纳磷石膏固废、 治理井下采空区,实现以废治废、绿色采矿的协同效益,可为磷矿山固废资源化利用与采空区治理提 供可靠的工程参考与技术示范。

关键词: 磷矿, 采空区充填, 改性二水磷石膏, 工业试验, 水质监测

Abstract: Aiming at the environmental pollution problems caused by large-scale storage of phospho⁃ gypsum and the hidden dangers of geological disasters in mine goaf,based on the engineering practice of Qingping Phosphate Mine,the optimization of underground filling ratio and field industrial test of modified dihydrate phosphogypsum were carried out. Phosphogypsum was used as the main material,and fly ash, lime and special admixtures were compounded to optimize the filling ratio. The engineering applicability and environmental safety of the filling technology were systematically verified by mechanical property test,toxic⁃ ity leaching test,retaining wall mechanical checking and whole process monitoring of global water environ⁃ ment. The test results show that the modified phosphogypsum filling body with optimized ratio has excellent working performance and can realize underground gravity transportation. The 28 d compressive strength reaches 6.19 MPa,which meets the design requirements of mine filling support. The modified system can ef⁃ fectively solidify harmful ions such as phosphorus and fluorine. The leaching concentrations of fluoride and phosphate in the filling body are 0.604 mg/L and 0.04 mg/L,respectively,which meet the standard of Class I general industrial solid waste and have good environmental compatibility. Field industrial test and water quality monitoring confirmed that the layered filling construction technology was safe and reliable,and the filling operation did not cause adverse effects on the regional groundwater and surface water environment.The economic benefit analysis shows that compared with the traditional sand-gravel filling process,this technology can save the filling cost by 25.494 million yuan/a. It can absorb the solid waste of phosphogyp⁃ sum on a large scale,control the underground goaf,and realize the synergistic benefit of waste treatment and green mining. It can provide reliable engineering reference and technical demonstration for the resource utilization of solid waste in phosphate mines and the treatment of goaf.

Key words: phosphorus mine, goaf filling, modified dihydrate phosphogypsum, industrial test, water quality monitoring