现代矿业 ›› 2026, Vol. 42 ›› Issue (09): 70-76.

• 采矿工程 • 上一篇    下一篇

某萤石矿盲电梯井反井钻机关键技术应用

张志维1 范才兵2 湛景震1,2,3 马树欣1 陈 旭1 李海斌1   

  1. 1. 丰宁万隆矿业发展有限公司;2. 中钢矿业开发有限公司;3. 北京科技大学资源与安全工程学院
  • 出版日期:2026-09-25 发布日期:2026-10-10

Application of Key Technology of Anti-well Drilling Rig in Blind Elevator Shaft of a Fluorite Mine

ZHANG Zhiwei1 FAN Caibing2 ZHAN Jingzhen1,2,3 MA Shuxin1 CHEN Xu1 LI Haibin1   

  1. 1. Fengning Wanlong Mining Development Co.,Ltd.;2. Sinosteel Mining Development Co.,Ltd.;3. School of Resources and Safety Engineering,University of Science and Technology Beijing
  • Online:2026-09-25 Published:2026-10-10

摘要: 深部萤石矿盲电梯井施工常需穿越高岭土化蚀变带、断层角砾岩带及软硬互层等复杂 地层,面临施工风险高、效率低、成井质量难以控制的技术难题。以某典型热液充填型萤石矿Ⅳ号矿 体1 323~1 423 m标高的盲电梯井工程为依托,系统开展了AT-3000L型大扭矩反井钻机施工技术研 究,提出“精细地质建模—风险预识别—动态工艺调控”一体化技术路线。在导孔阶段,每 2~3 m 采 集返渣进行岩性快速鉴定,实时修正地层模型并动态调整钻压、转速及泥浆性能;在扩孔阶段,针 对不同不良地质体实施“低钻压、低转速、大排量”等差异化稳控模式。工程实施结果表明,导孔偏 斜率控制在 0.38‰,扩孔后成井偏斜率为 0.45‰,远优于 1.0‰ 的设计标准;全施工过程实现零安全 事故;总工期为 45 d,较传统钻爆法缩短 65.38%,施工效率为钻爆法的 2.88 倍。井筒最大直径偏差 为-35~+42 mm,满足±50 mm的设计要求。研究成果可为复杂地质条件下深部井筒的安全高效建设 提供可复制的技术路径,对推动矿山工程机械化与智能化发展具有重要实践意义。

关键词: 反井钻机, 萤石矿, 盲电梯井, 复杂地层

Abstract: The construction of blind elevator shaft in deep fluorite mine often needs to cross complex strata such as kaolinization alteration zone,fault breccia zone and soft-hard interbedded strata,which is faced with the technical problems of high construction risk,low efficiency and difficult control of well quali⁃ ty. Based on the blind elevator shaft project at the elevation of 1 323~1 423 m in No. IV ore body of a typical hydrothermal filling fluorite mine,the construction technology of AT-3000 L high torque anti-well drilling rig was systematically studied,and the integrated technical route of“ine geological modeling-risk pre-iden⁃ tification-dynamic process control”was proposed. In the pilot hole stage,the return slag is collected every 2~3 m for rapid lithology identification,the formation model is corrected in real time,and the drilling pres⁃ sure,rotation speed and mud performance are dynamically adjusted. In the reaming stage,differentiated sta⁃ bility control modes such as“low drilling pressure,low rotation speed and large displacement”are imple⁃ mented for different unfavorable geological bodies. The engineering implementation results show that the de⁃ viation rate of the pilot hole is controlled at 0.38‰,and the deviation rate of the well after reaming is 0.45‰,which is far better than the design standard of 1.0‰. Zero safety accident in the whole construction process .The total construction period is 45 days,which is 65.38% shorter than that of the traditional drill⁃ ing and blasting method,and the construction efficiency is 2.88 times that of the drilling and blasting meth⁃ od. The maximum deviation of wellbore diameter is -35~+42 mm,which meets the design requirements of ±50 mm. The research results can provide a replicable technical path for the safe and efficient construction of deep shafts under complex geological conditions,and have important practical significance for promoting the mechanization and intelligent development of mine engineering.

Key words: anti-well drilling rig, fluorite mine, blind elevator shaft, complex strata