现代矿业 ›› 2026, Vol. 42 ›› Issue (09): 56-62.

• 采矿工程 • 上一篇    下一篇

分段崩落法中深孔挤压爆破关键技术参数确定与应用

曲鸿飞   

  1. 福建兴万祥建设集团有限公司
  • 出版日期:2026-09-25 发布日期:2026-10-10

Determination and Application of Key Technical Parameters of Deep Hole Extrusion Blasting in Sublevel Caving Method

QU Hongfei   

  1. Fujian Xingwanxiang Construction Group Co .,Ltd.
  • Online:2026-09-25 Published:2026-10-10

摘要: 针对铜山矿Ⅱ号矿体无底柱分段崩落法中深孔爆破存在的大块率偏高、采场眉线破坏 严重等工程问题,为提升铲装效率,保障井下回采作业安全,基于反射拉伸应力波叠加理论,结合矿 体矿岩物理力学特性、相似矿山工程经验及挤压爆破经验公式,系统优化确定了全套中深孔挤压爆 破关键技术参数。确定合理爆破最小抵抗线(排距)2 m,孔底距2~2.5 m,孔口距0.8~1.4 m,单位炸药 消耗量0.4~0.45 kg/t,常规工况崩矿步距4 m,局部加强爆破工况崩矿步距不大于5.1 m,排间微差间隔 时间 50 ms,并完成装药结构优化设计。依托矿区 330 m 分段 4条回采进路开展工业试验验证,结果 表明:优化方案实施后,≥700 mm矿岩大块率降至5%以内,单条进路眉线破坏次数不超过2次,二次 破碎炸药消耗量低于 0.15 kg/t,铲运机台班出矿量提升至 1 200 t以上。合理的排距与孔底距匹配及 精准的排间微差时序可实现爆破应力波高效叠加,配合优化的孔口防护装药结构,是控制爆破大块 率,抑制眉线损伤,实现矿山安全高效回采的核心关键。研究成果可为同类坚硬矿床无底柱分段崩 落法中深孔挤压爆破参数优化提供参考与借鉴。

关键词: 无底柱分段崩落法, 中深孔挤压爆破, 崩矿步距, 微差间隔时间

Abstract: Aiming at the engineering problems of high boulder rate and serious damage of stope eye⁃ brow line in deep hole blasting in sublevel caving method without sill pillar of No Ⅱ ore body in Tongshan Mine,in order to improve the shoveling efficiency and ensure the safety of underground mining operation, based on the superposition theory of reflective tensile stress wave,combined with the physical and mechani⁃ cal characteristics of ore body and rock,similar mine engineering experience and extrusion blasting empiri⁃ cal formula,the key technical parameters of medium and deep hole extrusion blasting are systematically op⁃ timized and determined. The minimum resistance line (row spacing) of reasonable blasting is determined to be 2 m,the hole bottom distance is 2~2.5 m,the hole mouth distance is 0.8~1.4 m,the unit explosive con⁃ sumption is 0.4~0.45 kg/t,the caving step distance under conventional working conditions is 4 m,the caving step distance under local strengthening blasting conditions is not more than 5.1 m,and the millisecond inter⁃ val between rows is 50 ms. The optimization design of charge structure is completed. The industrial test veri⁃ fication was carried out based on four mining routes in 330 m section of the mining area.The results show that after the implementation of the optimization scheme,the lump rate of ≥ 700 mm ore rock is reduced to less than 5%,the damage times of the eyebrow line of a single route are no more than 2 times,the consumption of secondary crushing explosives is less than 0.15 kg/t,and the ore output of the scraper is increased to more than 1 200 t. Reasonable matching of row spacing and hole bottom spacing,and accurate row-to-row milli⁃second timing can achieve efficient superposition of blasting stress waves. With the optimized orifice protec⁃ tion charge structure,it is the core key to control the blasting block rate,suppress the eyebrow line damage, and achieve safe and efficient mining in mines.The research results can provide reference for the optimization of deep hole extrusion blasting parameters in the non-pillar sublevel caving method of similar hard deposits.

Key words: sublevel caving method without sill pillar, medium-deep hole extrusion blasting, caving step distance, millisecond delay time