李雅庄煤矿综采面过断层前中深孔预裂爆破技术应用

宋晓杰   

  1. 霍州煤电集团有限责任公司李雅庄煤矿
  • 出版日期:2026-01-25 发布日期:2026-02-05

Application of Medium-deep Hole Precracking Blasting Technique before Crossing Fault in Fully-mechanized Mining Face of Liyazhuang Coal Mine

  1. Liyazhuang Coal Mine of Huozhou Coal and Electricity Group Co.,Ltd.
  • Online:2026-01-25 Published:2026-02-05

摘要: 为解决综采工作面过坚硬断层时,浅孔爆破技术无法有效预裂深部范围岩体,深孔爆 破技术对封孔段岩体预裂效果差,导致综采面推进速度慢及采煤机截齿损耗大的问题,以李雅庄煤 矿 2-801综采面过 F19断层为研究背景,采用理论分析、现场调研与实测分析等方法,对爆破技术原 理、孔深、孔径、炮孔间排距与装药参数进行研究,分析不同孔深对预裂爆破效果的影响。中深孔爆 破技术与深孔爆破技术相结合的方式,利用深孔爆破预裂断层深部大范围内的岩体,再对深孔炮孔 封堵段处岩体进行中深孔爆破,从而松动浅部岩体,使断层处岩体裂隙全范围发育,加以采煤机辅助 切割岩石,可以使综采面高效通过断层地带。结果表明,中深孔预裂技术通过2次爆破,极大程度地 弱化了岩体强度,使采煤机更易于截割岩体。通过记录观测,综采面过断层时每天平均推进速度提 高了 48%,采煤机平均截齿损耗降低 51%。通过中深孔预裂爆破技术,可以有效降低坚硬断层岩体 强度,节约生产成本,提高生产效率。

关键词: 中深孔爆破, 爆破预裂, 炮孔布置, 过断层

Abstract: To address the issue that shallow-hole blasting technology fails to effectively precrack the deep rock mass and has poor precracking effect on the rock mass in the sealed hole section when there is a hard fault in the fully mechanized mining face,resulting in slow advancement speed of the fully mecha⁃ nized mining face and high wear of the shearer's cutting teeth,this study takes the F19 fault in the 2-801 fully mechanized mining face of Liyazhuang Coal Mine as the research background. By means of theoretical analysis,on-site investigation and measured analysis,the principles of blasting technology,hole depth, hole diameter,spacing between blast holes and charge parameters were studied and analyzed to investigate the influence of different hole depths on the effect of precracking blasting. It is determined to adopt a com⁃ bined approach of medium-deep hole blasting technology and deep hole blasting technology. By using deep hole blasting to precrack the rock mass within a large area of the deep part of the fault,and then conduct⁃ ing medium-deep hole blasting on the rock mass at the deep hole blasting hole blocking section,the shal⁃ low rock mass can be loosening,allowing the rock mass fractures at the fault layer to develop throughout the range. With the assistance of a coal shearer in cutting the rock,the fully mechanized mining face can efficiently pass through the fault zone. The results show that through two blasting operations,the medium�deep hole precracking technology greatly reduces the strength of the rock mass,making it easier for the shearer to cut the rock mass. Through recorded observations,the average daily advancement speed of the fully mechanized mining face when passing through faults has increased by 48%,and the average wear of the shearer's cutting teeth has decreased by 51%. By medium-deep holes precracking blasting technology,
the strength of hard fault rock masses can be effectively reduced,production costs can be saved,and pro⁃
duction efficiency can be improved.

Key words: medium-deep hole blasting, blasting precracking, hole layout, crossing fault