河西金矿中等稳固矿体开采方法研究*

倾斜薄—中厚矿体的开采是矿山面临的难题之一。通过调查河西金矿地质条件及岩
体质量分级,判定矿岩为中等稳固。依据矿体形态、矿岩稳固程度,进行采矿方法优选。确定采用机
械化上向水平分层尾砂胶结充填法,并进行矿块布置以及采切、回采、充填等工艺设计。实践表明,
河西金矿采用机械化上向水平分层尾砂胶结充填法,采场矿石生产能力达 180 t/d,损失率 8.00%,贫
化率10.00%,作业安全性和工作效率得到提升。
  

  1. 1. 山东河西黄金集团有限公司河西金矿;
    2. 东北大学资源与土木工程学院
  • 出版日期:2024-02-18 发布日期:2024-08-14

Study on Mining Method of Medium Stable Ore Body in Hexi Gold Mine

The mining of inclined thin-medium thick ore bodies is one of the difficulties faced by
mines.By investigating the geological conditions and rock mass quality classification of Hexi gold deposit,it
is determined that the ore rock is medium stable.According to the shape of the ore body and the stability of
the ore rock,the mining method is optimized.It is determined that the mechanized upward horizontal layered
tailings cemented filling method is adopted,and the process design of ore block layout,mining,mining and
filling is carried out.The practice shows that the ore production capacity of the mechanized upward horizontal
layered tailings cemented filling method is adopted in Hexi Gold Mine reaches 180 t / d,the loss rate is
8.00%,the dilution rate is10.00%,and the operation safety and work efficiency are improved.
  

  1. 1. Hexi Gold Mine,Shandong Hexi Gold Group Co.,Ltd.;
    Abstract 2. School of Resources and Civil Engineering,Northeastern University
  • Online:2024-02-18 Published:2024-08-14

摘要:

倾斜薄—中厚矿体的开采是矿山面临的难题之一。通过调查河西金矿地质条件及岩
体质量分级,判定矿岩为中等稳固。依据矿体形态、矿岩稳固程度,进行采矿方法优选。确定采用机
械化上向水平分层尾砂胶结充填法,并进行矿块布置以及采切、回采、充填等工艺设计。实践表明,
河西金矿采用机械化上向水平分层尾砂胶结充填法,采场矿石生产能力达 180 t/d,损失率 8.00%,贫
化率10.00%,作业安全性和工作效率得到提升。

Abstract:

The mining of inclined thin-medium thick ore bodies is one of the difficulties faced by
mines.By investigating the geological conditions and rock mass quality classification of Hexi gold deposit,it
is determined that the ore rock is medium stable.According to the shape of the ore body and the stability of
the ore rock,the mining method is optimized.It is determined that the mechanized upward horizontal layered
tailings cemented filling method is adopted,and the process design of ore block layout,mining,mining and
filling is carried out.The practice shows that the ore production capacity of the mechanized upward horizontal
layered tailings cemented filling method is adopted in Hexi Gold Mine reaches 180 t / d,the loss rate is
8.00%,the dilution rate is10.00%,and the operation safety and work efficiency are improved.

Key words: