Modern Mining ›› 2024, Vol. 40 ›› Issue (04): 74-.

Previous Articles     Next Articles

Study on Optimization of Stope Structure Parameters Based on EWM-GRA
Comprehensive Evaluation

In order to achieve the goal of increasing production of an underground phosphate rock,the
EWM-GRA comprehensive evaluation model was constructed by combining the EWM entropy weight meth⁃
od and the GRA grey correlation method under the comprehensive consideration of mining safety,technical
and economic factors. Based on the evaluation model,nine groups of different stope structure parameter
schemes were analyzed. The results show that the scheme with the route width of 3.5 m and the route height
of 3 m is the best. From the field practice,the mining volume per meter of the 3.5 m × 3 m stope structure
parameter scheme is 27.37 % higher than that of the original design scheme,which can achieve the goal of
increasing production. Compared with the original scheme,the economic benefit of each approach has in⁃
creased by 28.33 thousand yuan,which is greater than the increased mining cost,indicating that the opti⁃
mized stope structure parameter scheme is reasonable and feasible. The research results can provide refer⁃
ence for the design of structural parameters of phosphate mine stope.
  

  1. 1. Yunnan Phosphor Group Co.,Ltd.; 2. National Phosphorus Resource Development and Utilization
    Engineering Technology Research Center; 3. School of Nuclear Resources and Safety Engineering,Nanhua
    University; 4. Sinosteel Maanshan General Institute of Mining Research Co.,Ltd.
  • Online:2024-04-15 Published:2024-08-13

Abstract:

In order to achieve the goal of increasing production of an underground phosphate rock,the
EWM-GRA comprehensive evaluation model was constructed by combining the EWM entropy weight meth⁃
od and the GRA grey correlation method under the comprehensive consideration of mining safety,technical
and economic factors. Based on the evaluation model,nine groups of different stope structure parameter
schemes were analyzed. The results show that the scheme with the route width of 3.5 m and the route height
of 3 m is the best. From the field practice,the mining volume per meter of the 3.5 m × 3 m stope structure
parameter scheme is 27.37 % higher than that of the original design scheme,which can achieve the goal of
increasing production. Compared with the original scheme,the economic benefit of each approach has in⁃
creased by 28.33 thousand yuan,which is greater than the increased mining cost,indicating that the opti⁃
mized stope structure parameter scheme is reasonable and feasible. The research results can provide refer⁃
ence for the design of structural parameters of phosphate mine stope.