Modern Mining ›› 2022, Vol. 38 ›› Issue (12): 92-.
Previous Articles Next Articles
ZHANG Hongjie
Online:
Published:
Abstract: In the process of high-level directional drilling instead of high-level drainage roadway to control upper corner gas,the hole diameter is one of the main factors affecting the implementation effect of the process. In order to improve the hole-forming efficiency of large-diameter high-level directional drill⁃ ing,through the comprehensive analysis of the factors of low construction efficiency caused by the existing high-level directional drilling multiple hole-forming process,drilling tool assembly,hole accident and so on,the hole-forming process of large-diameter high-level directional drilling is improved from three as⁃ pects of drilling rig selection,drilling tool matching and construction technology,so as to realize the onetime hole-forming of large-diameter high-level directional drilling. Through the test in Wangpo Coal Mine,the average construction efficiency of 200 mm hole diameter and 501 m final hole depth is 90 m/d, and the hole forming efficiency is increased by 76.5%. The new technology has the characteristics of simple process,high construction efficiency and strong accident prevention and treatment ability.
Key words: high-level directional borehole, drilling process, the efficiency of hole-forming, drilling liquid
ZHANG Hongjie. Research and Application of One-time Hole Forming Process of Large Diameter High-level Directional Drilling[J]. Modern Mining, 2022, 38(12): 92-.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.xdky.net/EN/
https://www.xdky.net/EN/Y2022/V38/I12/92