Modern Mining ›› 2019, Vol. 35 ›› Issue (01): 52-55.
Previous Articles Next Articles
Liu Xun,Wang Guolv,Ge Jianping,Zhao Feng,Lin Binggui
Online:
Published:
Abstract: Take a copper mine mining project as an example, during the construction of the scaled filling system, according to the geological data of the seam and combined with the current operational status of the production system, the high mobility and universal applicability of the miniaturized filling equipment are utilized in advance. The mining method in the transitional production period is flexibly adjusted to a small-scale two-step gravel cementation and filling method. While improving various economic indicators for mining, it has solved a series of safety and environmental issues in the process of mining, and has been widely promoted.
Key words: Crushed stone cement, Fill mining, Miniaturization, Transitional period
LIU Xun, WANG Guo-吕, GE Jian-Ping, ZHAO Feng, LIN Bing-Gui. Application of Small-scale Gravel Cement Filling in Transitional Production of a Copper Mine[J]. Modern Mining, 2019, 35(01): 52-55.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.xdky.net/EN/
https://www.xdky.net/EN/Y2019/V35/I01/52