Journals included in China Core Journals ( Selection ) Database
Journals included in American Chemical Abstracts ( CA )
National Journal of Science and Technology Papers Statistics Source
Chinese academic journals full-text journals
Journals included in Wanfang database
Vip information included journals
Excellent journals in East China
The classification catalogue of high-quality scientific journals in the field of earth science of China Association for Science and Technology is T2 level.
China Association for Science and Technology high-quality scientific journals in the field of coal classification directory T2 level
The classification catalogue of high-quality scientific journals in the field of non-ferrous metals of China Association for Science and Technology is T3 level
Wechat

Modern Mining ›› 2019, Vol. 35 ›› Issue (01): 48-51.

Previous Articles     Next Articles

Research on Integrated Construction Technology for Fast Supporting of Coal Roadway

Wang Chuangye,An Shufeng   

  1. Institute of Mining,Inner Mongolia University of Science and Technology
  • Online:2019-01-25 Published:2019-03-19

Abstract: Faced with the difficulty of excavation and replacement in the case of thin coal seams, this paper advocates the strengthening of mechanized roadway technology research.On this, the author took the investigation and research on the excavation and construction of coal roadway with 22 top 206 working face in Shigetai Coal Mine. First, demonstrate the feasibility of the continuous mining machine's application on the 22 coal seam;Secondly,based on the FLAC3D of numerical simulation,the multi-factor analysis of the optimal empty top distance in the continuous coal mining machine is carried out. Finally, practical verification of the support design parameters derived from numerical simulation. The results of the study finally show that: 22 top 206 working face continuous mining machine for mining tunneling easier to play equipment efficiency, when the continuous shearer and bolting machine spacing operation 8m coal lane empty top distance easier to ensure the efficiency of excavation;Secondly, on-site measurement also shows that the roof subsidence of the roadway is controlled when the roof bolts are installed on the roof of the roadway and the two anchor cables (the ceiling sinks about 25 mm).

Key words: Coal roadway excavation, FLAC3D, Roadway support, Mining roadway