Welcome to Metal Mine! Today is Share:
×

扫码分享

Modern Mining ›› 2014, Vol. 30 ›› Issue (04): 96-98+102.

Previous Articles     Next Articles

Design of the System of Tailings Transportation and Automatic Filling of Zhangjiawa Iron Mine

Xu Gengju,Wang Bing   

  1. Yantai Jinjian Metallurgy Technology Co.,Ltd.
  • Online:2014-04-15 Published:2014-06-06

Abstract: The system of tailings transportation and 1# orebody filling station are designed by adopting of the mature and reliable instrumentation and advanced control method.The filling station,diaphragm pump room,valve room are integrated to monitor and operate uniformly,so as to achieve the high degree of automation by profibus DP and wireless communication technology.It is concluded that the above research results can reduce the labor intensity of workers and the filling cost,besides that,it also can improve the quality of the high concentration of filling slurry to obtain good filling effect.

Key words: Tailings transportation, Automation system of filling, Diaphragm pump, Wireless communication, Digital radio