Modern Mining ›› 2012, Vol. 28 ›› Issue (05): 1-3+20.
Next Articles
Zhang Chengming1,Dou Guangwen2
Online:
Published:
Abstract: Upward type horizontal sub-level cemented filling mining method has been adopted in 14-5# ore body of Laochang tin ore, but a series of problems exposed. Through adoption of layering open stope afterwards cemented rockfill mining method, slope structural parameters were optimized, problems were solved and good economic effects was obtained.
Key words: Cemented rockfill, Dilution rate, Loss rate, Filling cost
ZHANG Cheng-Ming, DOU Guang-Wen. Application of Layering Open Stope Afterwards Cemented Rockfill Mining Method[J]. Modern Mining, 2012, 28(05): 1-3+20.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.xdky.net/EN/
https://www.xdky.net/EN/Y2012/V28/I05/1