某铅锌矿采空区稳定性分析及处理方案研究

王 星1,2 赵 艳1,2 吴 旭1,2   

  1. 1. 中钢集团马鞍山矿山研究总院股份有限公司;2. 金属矿山开采安全与灾害防治全国重点实验室
  • 出版日期:2025-05-25 发布日期:2025-07-25

Stability Analysis and Treatment Scheme Study of Goaf in a Lead-zinc Mine

WANG Xing1,2 ZHAO Yan1,2 Wu Xu1,2   

  1. 1. Sinosteel Maanshan General Institute of Mining Research Co.,Ltd.; 2. State Key Laboratory of Metal Mine Mining Safety and Disaster Prevention and Control
  • Online:2025-05-25 Published:2025-07-25

摘要: 以福建某铅锌矿采空区为研究背景,通过对矿区的自然地理条件详细调查,建立了三 维力学分析模型,定量评价了采空区的稳定性。利用数值模拟技术,通过有限差分法,模拟了单采空 区和采空区群的稳定性,发现其受原岩应力、结构面、岩性、地下水条件等多种因素影响。基于稳定 性综合评价指标体系,将采空区围岩稳定性划分为稳定状态、基本稳定状态、欠稳定状态和不稳定状 态4个等级,其中3个不稳定采空区位于160~170 m中段,存在较高失稳风险。针对不同采空区,提出 了以封闭隔离为主的处理方案,辅以废石堆填和巷道加固措施。同时,评估了矿柱回收的可行性,确 定了回收原则和条件。研究表明,合理的采空区处理和矿柱回收方案对保障矿山安全生产和资源高 效利用至关重要,并建议采取有效的地压控制措施,及时调整开采方案,确保矿山长期稳定运营。

关键词: 采空区稳定性, 数值模拟, 有限差分法, 矿柱回收, 安全措施, 地压控制

Abstract: Taking the goaf of a lead-zinc mine in Fujian as the research background,a three-dimen⁃ sional mechanical analysis model is established through a detailed investigation of the natural geographical conditions of the mining area,and the stability of the goaf is quantitatively evaluated. Using numerical simu⁃ lation technology and finite difference method,the stability of single goaf and goaf group is simulated. It is found that it is affected by many factors such as original rock stress,structural plane,lithology and ground⁃ water conditions. Based on the comprehensive evaluation index system of stability,the stability of surround⁃ ing rock in goaf is divided into four grades : stable state,basic stable state,unstable state and unstable state. Among them,three unstable goafs are located in the middle section of 160 ~ 170 m,and there is a high risk of instability. In view of the different goafs,a treatment scheme based on closed isolation is pro⁃ posed,supplemented by waste rock filling and roadway reinforcement measures. At the same time,the feasi⁃ bility of pillar recovery is evaluated,and the recovery principles and conditions are determined. The re⁃ search shows that reasonable goaf treatment and pillar recovery scheme are very important to ensure the safe production and efficient utilization of resources. It is suggested to take effective ground pressure control mea⁃ sures and adjust the mining scheme in time to ensure the long-term stable operation of the mine.

Key words: goaf stability, numerical simulation, finite difference method, pillar recovery, ground pressure control