孤岛工作面小煤柱沿空掘巷卸荷-支护破坏特征及围岩控制

刘 瑜1 徐 鑫2 程 详3   

  1. 1. 安徽省皖北煤电集团有限责任公司;2. 安徽理工大学矿业工程学院; 3. 煤炭无人化开采数智技术全国重点实验室
  • 出版日期:2026-09-25 发布日期:2026-10-10

Unloading-support Failure Characteristics and Surrounding Rock Control of Small Coal Pillar Gob-side Entry Driving in Island Working Face

LIU Yu1 XU Xin2 CHENG Xiang3   

  1. 1. Anhui Wanbei Coal-electricity Group Co.,Ltd.; 2. School of Mining Engineering,Anhui University of Science and Technology; 3. State Key Laboratory of Digital Intelligent Technology for Unmanned Coal Mining
  • Online:2026-09-25 Published:2026-10-10

摘要: 针对孤岛工作面小煤柱沿空掘巷围岩易发生大变形的控制难题,以恒源煤矿二水平南 翼煤柱工作面风巷为工程背景,采用真三轴卸荷-支护路径试验、声发射监测与现场矿压监测相结合 的方法,研究煤体在开挖卸荷及卸荷后支护条件下的力学响应、裂纹演化特征及围岩控制机制。结 果表明:单面卸荷与卸荷后支护2种应力路径下煤体均呈渐进式破坏特征;与单面卸荷路径相比,支 护路径下试样峰值强度由58.13 MPa提高至89.07 MPa,增幅为53.23%,峰值轴向位移由4.53 mm增至 6.39 mm,增幅为41.06%,表明支护补偿显著提高了煤体承载能力与变形协调能力。2种路径下煤体 破坏均以拉伸裂纹为主,但支护路径下内部裂纹演化持续性更强,中频声发射事件占比由68.70%提 高至88.43%。现场监测表明,原支护条件下试验段围岩变形具有明显分区特征,测站距二水平南翼 煤柱工作面 65 m以外围岩趋于稳定,测站距二水平南翼煤柱工作面 30~65 m区域为渐进变形区,测 站距二水平南翼煤柱工作面30 m以内区域进入剧烈变形阶段,顶板离层峰值达37.2 mm,顶底板与两 帮最大收敛量分别为421和463 mm。基于试验结果与现场矿压显现规律,提出“锚索梁+高强度锚杆 全长锚固+间歇反复注浆改性”协同控制技术。工程应用后,围岩稳定区缩短至测站距二水平南翼煤 柱工作面40 m以外,顶底板与两帮最大相对移近量分别降至299和327 mm,较优化前均降低约29%, 顶板离层量控制在 33 mm 以内。研究结果可为类似条件下孤岛工作面小煤柱沿空掘巷围岩大变形 控制提供参考。

关键词: 孤岛工作面, 真三轴卸荷试验, 沿空掘巷, 围岩协同控制

Abstract: Aiming at the control problem that the surrounding rock of small coal pillar gob-side entry driving in island working face is prone to large deformation,taking the air roadway of the second level south wing coal pillar working face of Hengyuan Coal Mine as the engineering background,the mechanical re⁃ sponse,crack evolution characteristics and surrounding rock control mechanism of coal body under the con⁃ ditions of excavation unloading and post-unloading support were studied by means of true triaxial unloading�support path test,acoustic emission monitoring and field mine pressure monitoring. The results show that the coal under the two stress paths of single-side unloading and post-unloading support is characterized by progressive failure. Compared with the single-sided unloading path,the peak strength of the sample under the support path increases from 58.13 MPa to 89.07 MPa,with an increase of 53.23%,and the peak axial displacement increases from 4.53 mm to 6.39 mm,with an increase of 41.06%,indicating that the support compensation significantly improves the bearing capacity and deformation coordination ability of the coal body. The coal failure under the two paths is dominated by tensile cracks,but the internal crack evolution under the support path is more persistent,and the proportion of intermediate frequency acoustic emission events increases from 68.70% to 88.43%. Field monitoring shows that,under the original support condi⁃ tions,the surrounding rock deformation in the test section exhibits obvious zonal characteristics. The sur⁃ rounding rock tends to be stable beyond 65 m from the second horizontal south wing coal pillar working face. The area between 30 m and 65 m from the second horizontal south wing coal pillar working face is a progres⁃ sive deformation zone. The area within 30 m from the second horizontal south wing coal pillar working face enters the stage of severe deformation. The peak value of roof separation is 37.2 mm,and the maximum con⁃ vergence of roof and floor and two sides is 421 mm and 463 mm respectively. Based on the test results and the law of mine pressure in the field,the coordinated control technology of“anchor beam + high-strength anchor full-length anchoring + intermittent repeated grouting modification”is proposed. After the engineer⁃ ing application,the stable area of surrounding rock is shortened to 40 m away from the south wing coal pillar working face of the second level,and the maximum relative displacement between the roof and floor and the two sides is reduced to 299 mm and 327 mm respectively,which is about 29 % lower than that before optimi⁃ zation,and the roof separation is controlled within 33 mm. The research results can provide reference for the large deformation control of surrounding rock of small coal pillar gob-side entry driving in island working face under similar conditions.

Key words: island working face, true triaxial unloading test, gob-side entry driving, surrounding rock coordinated control