基于模糊综合评判的二步骤矿柱回采方案优选及应用

张国权1,2 梅林芳3 陈迪云1   

  1. 1. 武钢资源集团大冶铁矿有限公司;2. 武汉科技大学资源与环境工程学院; 3. 武钢资源集团有限公司
  • 出版日期:2026-06-25 发布日期:2026-07-27

Optimal Selection and Application of Second Step Pillar Mining Method Based on Fuzzy Comprehensive Evaluation

ZHANG Guoquan1,2 MEI Linfang3 CHEN Diyun1   

  1. 1. Daye Iron Mine Co.,Ltd.,WISCO Resources Group;2. School of Resources and Environmental Engi⁃ neering,Wuhan University of Science and Technology;3. WISCO Resources Group Co.,Ltd.
  • Online:2026-06-25 Published:2026-07-27

摘要: 针对某铁矿采用分段空场嗣后充填采矿法进行矿体的回采后,二步骤矿柱开采条件 恶化,出现应力集中、地压显著等问题,开展二步骤矿柱回采方案优选工作。先结合现场工程条件 与资源回收需求,拟定分段空场嗣后充填法、分层充填法、浅孔留矿嗣后充填法 3种可行回采方案, 并确定各方案技术经济指标;随后采用模糊综合评判法开展方案优选,结合层次分析法与德尔菲专 家打分法,确定各评价指标的权重分配;运用线性函数法、二元对比排序法分别计算定量与定性指 标的模糊隶属度,构建隶属度矩阵并以加权平均法完成综合评判。结果显示,分段空场嗣后充填 法、分层充填法、浅孔留矿嗣后充填法的模糊综合评判结果值依次为 0.487 6、0.452 5、0.419 3,分段 空场嗣后充填法评判值最高。现场应用后表明,该方案可充分利用矿房回采时的原有采准工程, 使揭露的充填体完整性好无垮塌,具有良好的技术经济指标和安全性,为复杂条件下的矿柱回采 提供了科学可靠的决策依据,具备良好的工程应用价值。

关键词: 二步骤矿柱, 分段空场嗣后充填法, 回采方案优选, 模糊综合评判法

Abstract: Aiming at the problems of stress concentration and significant ground pressure caused by the deterioration of the mining conditions of the second step pillar after the ore body is mined by the sublev⁃ el open stoping with subsequent filling mining method in an iron mine,this study carried out the optimal selection of the second step pillar mining scheme. Firstly,combined with the site engineering conditions and resource recovery requirements,three feasible mining schemes of sublevel open stoping with subse⁃ quent filling method,layered filling method and shallow hole shrinkage with subsequent filling method are proposed,and the technical and economic indexes of each scheme are determined. Then,the fuzzy com⁃ prehensive evaluation method is used to carry out the scheme optimization. Combined with the analytic hier⁃ archy process and Delphi expert scoring method,the weight distribution of each evaluation index is deter⁃ mined. The linear function method and binary comparison sorting method are used to calculate the fuzzy membership degree of quantitative and qualitative indexes respectively,and the membership degree matrix is constructed and the weighted average method is used to complete the comprehensive evaluation. The re⁃ sults show that the fuzzy comprehensive evaluation results of sublevel open stoping subsequent filling meth⁃ od,layered filling method and shallow hole shrinkage subsequent filling method are 0.487 6,0.452 5 and 0.419 3 respectively,and the evaluation value of sublevel open stoping subsequent filling method is the highest. The field application shows that this scheme can make full use of the original mining preparation project during the room mining,so that the integrity of the exposed filling body is good without collapse, and has good technical and economic indicators and safety. It provides a scientific and reliable decision�making basis for pillar mining under complex conditions,and has good engineering application value.

Key words: second step pillar, sublevel open stoping with subsequent filling, optimal selection of mining Method, fuzzy comprehensive evaluation method