大采高孤岛工作面矿压显现规律及治理保障体系研究

  

  1. 中国煤炭科工集团山西天地王坡煤业有限公司
  • 出版日期:2026-02-25 发布日期:2026-03-10

Study on Mining Pressure Behavior Law and Control Guarantee System of Isolated Island Working Face with Large Mining Height

  1. CCTEG Shanxi Tiandi Wangpo Coal Industry Co.,Ltd.
  • Online:2026-02-25 Published:2026-03-10

摘要: 受矿井地质条件、采场布局及掘采工艺等因素制约,部分矿井采用跳采接替模式形 成双侧临空的孤岛工作面,此类工作面在回采期间普遍面临强矿压威胁,严重危及生产安全。以 王坡煤矿 3210 大采高孤岛工作面为研究对象,综合运用理论分析、数值模拟与现场实测方法,系 统探究孤岛工作面矿压显现规律、超前支承压力分布特征及顺槽围岩变形破坏机制。研究结果表 明,3210 工作面回采阶段应力集中程度显著增高,矿压显现剧烈,围岩损伤破坏问题突出;现场矿 压监测明确了工作面周期来压步距及运输顺槽变形破坏规律。基于“技术引领、理念革新、理论与 实践结合”的治理思路,构建包含创新支护理念、高效围岩控制技术、全周期矿压治理评价的大采 高孤岛工作面矿压治理体系。工程应用显示,3210 回风巷成型 2 个月后,围岩位移趋于稳定,顶板 下沉量控制在 10 mm 以内,两帮收缩量不超过 190 mm,巷道围岩变形得到有效管控,实现工作面 安全高效回采。研究成果可为同类地质条件下孤岛工作面矿压治理提供技术参考。

关键词: 孤岛工作面, 矿压显现, 围岩变形, 超前支承压力

Abstract: Restricted by factors such as mine geological conditions,stope layout and excavation-min⁃ ing technology,some mines adopt the skip mining succession mode to form isolated island working faces with two sides exposed. Such working faces are generally confronted with the threat of strong ground pres⁃ sure during mining,which seriously endangers production safety. Taking the 3210 large mining height iso⁃ lated island working face of Wangpo Coal Mine as the research object,this study systematically explored the mining pressure behavior law,advance abutment pressure distribution characteristics and surrounding rock deformation and failure mechanism of the isolated island working face by comprehensively using theo⁃ retical analysis,numerical simulation and field measurement methods. The results show that the stress con⁃ centration degree of the 3210 working face increases significantly during the mining stage,with intense ground pressure behavior and prominent surrounding rock damage and failure problems. Field ground pres⁃ sure monitoring clarified the periodic weighting interval of the working face and the deformation and failure law of the transportation gateway. Based on the governance concept of "technology leadership,concept in⁃ novation and combination of theory and practice",a ground pressure control system for large mining height isolated island working faces is constructed,which includes innovative support concept,high-efficiency surrounding rock control technology and full-cycle ground pressure governance evaluation. Engineering ap⁃ plication shows that the surrounding rock displacement of the 3210 return air gateway tends to be stable 2 months after its formation,the roof subsidence is controlled within 10 mm,and the two-side convergence is no more than 190 mm. The surrounding rock deformation of the gateway is effectively controlled,realiz⁃
ing the safe and efficient mining of the working face. The research results can provide technical reference
for ground pressure control of isolated island working faces under similar geological conditions.

Key words: isolated island working face, mining pressure behavior, surrounding rock deformation, ad? vance abutment pressure