某大断面隧道掘进爆破优化设计

金 科1,2 高琪琪1,2 潘祖瑛1,2   

  1. 1. 中钢集团马鞍山矿山研究总院股份有限公司;2. 马鞍山矿山研究院爆破工程有限责任公司
  • 出版日期:2026-02-25 发布日期:2026-03-10

Optimization Design of Excavation Blasting for a Large Section Tunnel

  1. 1. Sinosteel Maanshan General Institute of Mining Research Co., Ltd.; 2. Maanshan Institute of Mining Research Blasting Engineering Co., Ltd.
  • Online:2026-02-25 Published:2026-03-10

摘要: 针对某隧道原爆破设计单循环进尺偏于保守的问题,结合首阶段施工验证及现场勘 查结果,发现隧道围岩实际稳定性优于地质勘查报告结论,具备加大单次循环爆破开挖进尺的安 全实施条件。基于此,对隧道掘进爆破方案进行优化设计,并配套采取针对性安全防护措施。研 究结果表明:优化方案可有效降低爆破振动、飞石及冲击波等灾害对隧道结构与周边设施的损伤; 隧道掘进断面岩性完整区域炮孔有效进尺率达 86%~96%,全断面炮孔有效进尺率达 81%~92%,顶 板成型质量优良;同时显著降低了隧道掘进及支护施工成本,大幅缩短工程建设工期。该优化方 案及实施经验可为同类围岩条件隧道工程的爆破施工提供重要技术参考。

关键词: 隧道掘进, 光面爆破, 数码电子雷管, 爆破振动, 围岩稳定性

Abstract: In view of the conservative problem of single-cycle footage in the original blasting design of a tunnel,combined with the first-stage construction verification and on-site investigation results,it is found that the actual stability of the surrounding rock of the tunnel is better than the conclusion of the geo⁃ logical exploration report,and it has the safety implementation conditions for increasing the footage of sin⁃ gle-cycle blasting excavation. Based on this,the tunnel excavation blasting scheme is optimized and the targeted safety protection measures are taken. The results show that the optimization scheme can effectively reduce the damage of tunnel structure and surrounding facilities caused by blasting vibration,flying rock and shock wave. The effective footage rate of blast holes in the lithologic integrity area of the excavation section of the tunnel is 86% ~ 96%,and the effective footage rate of full-section blast holes is 81% ~ 92%,and the roof forming quality is excellent. At the same time,it significantly reduces the cost of tunnel excavation and support construction,and greatly shortens the construction period of the project. The opti⁃ mization scheme and implementation experience can provide important technical reference for blasting con⁃ struction of tunnel engineering with similar surrounding rock conditions.