现代矿业 ›› 2025, Vol. 41 ›› Issue (10): 176-181.

• 实用技术 • 上一篇    下一篇

本钢矿业露天矿山边坡监测预警系统建设及应用

富建华1 吕 犇2 黄 崇1 姜学涛1 蒋凤子3   

  1. 1. 本溪钢铁(集团)矿业有限责任公司;2. 中冶沈勘工程技术有限公司;3. 本溪市应急管理局
  • 出版日期:2025-10-25 发布日期:2025-12-08

Research and Application of Slope Monitoring and Early Warning System for Open-pit Mines of Benxi Steel Mining

  1. 1. Benxi Iron & Steel (Group) Mining Co.,Ltd.; 2. ShenKan Engineering & Technology Corporation,MCC; 3. Benxi City Emergency Management Bureau
  • Online:2025-10-25 Published:2025-12-08

摘要: 为降低矿山边坡事故风险,收集和研究南芬露天铁矿采场已有地质资料,结合采场采 掘计划图及现场地质调查,对南芬露天矿采场的边坡高度、坡度、地质条件、稳定性划分安全监测等 级,对边坡监测预警系统进行整体设计,并实施补充雷达、GNSS、爆破震动、内部位移等监测技术。通 过监测数据整编和分析,为边坡稳定性安全评价提供可靠依据,实现 150 m 以上高陡边坡监测全覆 盖,满足国家监测要求标准,推动了事故防范向事前预警防范转型。对比补充完善监测系统前,年避 免因边坡造成的设备损失约370万元,有效避免人员伤害,降低人工监测作业风险,有效减少了高陡 边帮人工巡检的次数,节省人工成本费用约 20万/a。通过对边坡风险的预测和研判,生产调度系统 合理调整优化阶段开采顺序组织,矿石优化产出量提高至 1 459万 t,同比增加矿石采出总量 42万 t, 新增经济效益4 944.66万元。

关键词: 雷达, 边坡监测, 预警系统

Abstract: In order to reduce the risk of slope failures in mines by collecting and analyzing existing geological data from the Nanfen open-pit iron mine,integrating the mine's excavation planning maps with on-site geological surveys,the safety monitoring levels for the pit slopes were classified based on parame⁃ ters such as slope height,gradient,geological conditions,and stability assessments. A comprehensive de⁃ sign was developed for the slope monitoring and early warning system. The implementation of supplementa⁃ ry monitoring technologiesincluding ground-based radar,GNSS,blast vibration monitoring,and internal displacement monitoring were carried out. Through data compilation and analysis,the system provides a reliable basis for evaluating the stability and safety of mine slopes,which achieves full coverage monitor⁃ ing of high and steep slopes exceeding 150 m in height,meets national monitoring standards facilitates a transformation from post-accident response to proactive,pre-accident early warning and prevention. Com⁃ pared to the period before the enhanced monitoring system implemented,equipment loss due to slope in⁃ stability is reduced by approximately 3.7 million yuan/a,effectively preventing personnel injuries. The sys⁃ tem also reduces the risks associated with manual monitoring and significantly decreases the frequency of manual inspections on high and steep slopes,saving about 200 000 yuan/a in labor costs. By predicting and assessing slope risks,the production scheduling systemadjusts and optimizesthe mining sequence ra⁃ tionally. As a result,the optimized ore output increased to 14.59 million t,representing a year-on-year increase of 420 000 t in total ore production,generating additional economic benefits of 49.4466 million yuan/a.

Key words: radar, slope monitoring, early warning system