某尾矿库销库工程回采设计及稳定性研究

对销库尾矿库进行尾矿回采,是提高矿产资源利用率的有效途径,而滑坡、溃坝等灾害
事故在销库工程中频发。为探究出高效经济的回采方式,以多雨潮湿地区某尾矿库销库工程为例,
通过分析技术条件进行方案设计,并基于数值模拟手段进行稳定性分析。结果表明:该尾矿库宜采
用坝前干式+库内湿式的联合回采工艺,按由内到外、先库后坝、从上至下、单层开采的顺序进行回
采,在回采过程中坝体稳定性均符合安全要求。
  

  1. 1. 中钢集团马鞍山矿山研究总院股份有限公司;
    2. 华唯金属矿产资源高效循环利用国家工程研究中心有限公司;
    3. 金属矿山安全与健康国家重点实验室;
    4. 非煤露天矿山灾害防控国家矿山安全监察局重点实验室;
    5. 湖南宝山有色金属矿业有限责任公司
  • 出版日期:2024-02-18 发布日期:2024-08-14

Study on Mining Design and Stability of a Closing the Tailing Pond

Tailings mining is an effective way to improve the utilization rate of mineral resources,and
disasters such as landslides and dam breaks occur frequently in the project of closing the tailing pond. In or⁃
der to explore the efficient and economical mining method and safety,taking the closing the tailing pond
project in a rainy and humid area as an example,the scheme design is carried out through analyzing the
technical conditions,and the stability analysis is carried out based on numerical simulation. The results
show that the combined stoping process of dry stoping in front of the dam and wet stoping in the reservoir
should be adopted. The stoping sequence is carried out according to the principles of from inside to outside,
from reservoir to dam,from top to bottom and single-layer mining. The stability of the dam body meets the
safety requirements during the stoping process.
  

  1. 1. Sinosteel Maanshan General Institute of Mining Research Co.,Ltd.;
    2. Huawei National Engineering Research Center for Efficient Recycling of Metallic Mineral Resources Co.,Ltd.;
    3. State Key Laboratory of Safety and Health for Metal Mines;4. Key Laboratory of Disaster Prevention and Control for Non-coal
    Open-pit Mines of National Mine Safety Administration;5. Hunan Baoshan Nonferrous Metals Mining
    Co.,Ltd.
  • Online:2024-02-18 Published:2024-08-14

摘要:

对销库尾矿库进行尾矿回采,是提高矿产资源利用率的有效途径,而滑坡、溃坝等灾害
事故在销库工程中频发。为探究出高效经济的回采方式,以多雨潮湿地区某尾矿库销库工程为例,
通过分析技术条件进行方案设计,并基于数值模拟手段进行稳定性分析。结果表明:该尾矿库宜采
用坝前干式+库内湿式的联合回采工艺,按由内到外、先库后坝、从上至下、单层开采的顺序进行回
采,在回采过程中坝体稳定性均符合安全要求。

Abstract:

Tailings mining is an effective way to improve the utilization rate of mineral resources,and
disasters such as landslides and dam breaks occur frequently in the project of closing the tailing pond. In or⁃
der to explore the efficient and economical mining method and safety,taking the closing the tailing pond
project in a rainy and humid area as an example,the scheme design is carried out through analyzing the
technical conditions,and the stability analysis is carried out based on numerical simulation. The results
show that the combined stoping process of dry stoping in front of the dam and wet stoping in the reservoir
should be adopted. The stoping sequence is carried out according to the principles of from inside to outside,
from reservoir to dam,from top to bottom and single-layer mining. The stability of the dam body meets the
safety requirements during the stoping process.

Key words: