某铁矿强泥化强富水巷道突水治理技术研究

殷登才 孙茂贵 张清 印提军   

  1. 安徽马钢矿业资源集团姑山矿业有限公司
  • 出版日期:2023-01-25 发布日期:2023-05-12

Study on Water Inrush Control Technology of Strong Slime and Strong Water-rich Roadway in an Iron Mine

YIN Dengcai  SUN Maogui  ZHANG Qing  YIN Tijun   

  1. Anhui Maanshan Mining Resources Group Gushan Mining Co.,Ltd.
  • Online:2023-01-25 Published:2023-05-12

摘要: 某铁矿在井下巷道开拓过程中遇强泥化、强富水地层时发生片帮塌方,进而导致突 水突泥。抢险治理时,挡水墙施工困难,且传统注浆技术对细小裂隙充填效果差,容易引发二次突 水。为解决以上问题,采用一种挡泥墙控泥、挡水墙控水的双挡墙结构体,并结合化学浆充填细微 裂隙、超前管棚预支护的综合治理技术进行治理。通过双挡墙封堵,置换巷道开挖轮廓线外部泥 化闪长岩,采用化学注浆材料充填细小裂隙,采用超前管棚对破碎软弱的泥化闪长岩进行预支护, 以及在接下来掘进施工时采用短掘短支等一系列措施,保障了巷道的安全通过。通过实践验证, 该技术不仅能在抢险施工中有效预防二次灾害发生,还能运用于各类软弱岩石、泥化闪长岩细微 裂隙等复杂的工程地质、水文地质条件下的围岩加固,防止片帮、冒顶及突水,极具推广价值。

关键词: 强泥化, 强富水, 挡泥墙, 置换

Abstract: In the course of developing the underground roadway in an iron mine,a collapse occurred in the face of strong-argillization and water-abundance stratum,which resulted in water and mud inrush. During emergency treatment,the construction of water retaining wall is difficult,and the effect of traditional grouting technology on filling small fissures is poor,which is easy to cause secondary water inrush. In order to solve the above problems,this paper adopts a double retaining wall structure of mud retaining wall to control mud and water retaining wall to control water,and combined with the comprehensive treatment tech⁃ nology of chemical slurry filling tiny cracks and advanced pipe shed pre support.Used double retaining walls to seal and replace the outside mud diorite area of the tunnel excavation contour line,then uses chemical grouting material to fill the small fissures,finally,the advance pipe shed is used to pre-support the broken and weak argillaceous diorite,and a series of measures such as short excavation and short support are adopted in the next tunneling construction to ensure the safe passage of the roadway. Through the practice,this technology can not only effectively prevent the secondary disasters in the emergency construction,it can also be used to reinforce surrounding rock under complicated engineering and hydrogeological conditions,such as soft rock,fine fissures of argillaceous diorite and so on.

Key words: strong argillization, water abundance, mud wall, replacement