某露天矿边坡变形区治理及开采方案研究

王浩然1,2 侯成恒1,2 常剑1,2 苏强1,2 郭霁1,2 李晓雨3   

  1. 1. 中煤科工集团沈阳研究院有限公司;2. 煤矿安全技术国家重点实验室; 3. 辽宁石油化工大学经济管理学院
  • 出版日期:2023-01-25 发布日期:2023-05-12
  • 基金资助:
    中国煤炭科工集团有限公司科技创新创业资金专项重点项目(编号:2019-ZD004)。

Study on Treatment and Mining Scheme of Slope Deformation Area in an Open-pit Mine

WANG Haoran1,2 HOU Chengheng1,2 CHANG Jian1,2 SU Qiang1,2 GUO Ji1,2 LI Xiaoyu3   

  1. 1. CCTEG Shenyang Research Institute;2. State Key Laboratory of Coal Mine Safety Technology;3.School of Econmics and Management ,Liaoning Petrochemical University
  • Online:2023-01-25 Published:2023-05-12

摘要: 为确保露天矿变形区安全高效开采煤矿资源,以国内某一露天矿为依据对边坡变形 区进行治理及开采方案研究。通过地质资料、现场地质调查及工程地质勘察等方法研究变形区地 质条件,对变形区煤、岩体进行物理力学实验并综合分析得到物理力学指标,建立工程地质模型, 采用数值模拟方法研究边坡变形破坏机理,根据边坡稳定性计算结果制定边坡治理及开采方案。 结果表明:①边坡变形区变形集中在上部,以沉降变形为主,下部受上部重力载荷影响存在应力集 中,边坡变形破坏模式为“圆弧式”变形破坏;②边坡变形区采用先治理后开采的技术方案,使变形 区边坡达到稳定,满足开采要求。先治理后开采是在普通工况下确保边坡变形区安全高效开采的 最佳方案,对于工况相近边坡治理及资源开采具有一定指导意义。

关键词: 露天矿, 边坡变形区, 工程地质模型, 边坡稳定性, 边坡治理

Abstract: In order to ensure the safe and efficient mining of coal resources in the open-pit deforma⁃ tion area,the treatment and mining scheme of slope deformation area are studied based on an open-pit mine in China.The geological conditions of the deformation area were studied by collecting geological data, field geological survey and engineering geological investigation. The physical and mechanical indexes of coal and rock mass in deformation area are obtained by comprehensive analysis. The engineering geological model is established.The slope deformation and failure mechanism is studied by numerical simulation method,and the slope treatment and mining scheme is formulated according to the calculation results of slope stability.The results show that: ①the deformation of the slope deformation area is concentrated in the upper part,mainly settlement deformation,and the lower part has stress concentration under the influence of the upper gravity load. The slope deformation failure mode is "circular arc" deformation failure. ②The slope deformation area adopts the technical scheme of treatment before mining,so that the slope in the deformation area can achieve stability and meet the mining requirements.Treatment before mining is the best scheme to ensure safe and efficient mining in slope deformation area under normal working conditions,which has certain guiding significance for slope treatment and resource mining management under similar working conditions.

Key words: open-pit mine, slope deformation zone, engineering geological model, slope stability, slope governance