欢迎访问《现代矿业》杂志官方网站,今天是 分享到:
×

扫码分享

现代矿业 ›› 2022, Vol. 38 ›› Issue (07): 59-.

• 采矿工程 • 上一篇    下一篇

扁担山矿露天爆破开采对铁路工业设施安全影响分析

娄广文1,2,3 范庆1,2,3 夏勇4   

  1. 1. 中钢集团马鞍山矿山研究总院股份有限公司;2. 金属矿山安全与健康国家重点实验室; 3. 华唯金属矿产资源高效循环利用国家工程研究中心;4. 怀宁上峰水泥有限公司
  • 出版日期:2022-07-25 发布日期:2023-06-07

Analysis of the Impact of Open-pit Blasting on the Safety of Railway Industrial Facilities in Biandanshan Mine

LOU Guangwen1,2,3 FAN Qing1,2,3 XIA Yong4   

  1. 1. Sinosteel Maanshan General Institute of Mining Research Co.,Ltd.;2. State Key Laboratory of Safety and Health for Metal Mine;3. Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co.,Ltd;4. Huaining Shangfeng Cement Co.,Ltd.
  • Online:2022-07-25 Published:2023-06-07

摘要: 扁担山矿北侧有合九铁路安庆支线及民房等建构筑物设施,为保护铁路及民房安 全,分析爆破过程中产生的地震效应、爆破飞石、爆炸空气冲击波、爆破及生产粉尘等危险有害因 素的种类、分布情况、严重程度及潜在的事故隐患,分析有关爆破参数对合九铁路运行的安全可靠 性。根据露天矿山开采区域与合九铁路地理位置关系及现场作业条件,采用Blast-UM型爆破振动 测试仪对现场布置测试点进行爆破测试。根据爆破测试结果,回归计算爆破衰减系数,确定爆破 工程级别,并对露天爆破作业产生的爆破振动速度、爆破冲击波及爆破飞石等安全距离进行计算, 依据相关技术标准、规范,开展矿区东北侧露天爆破开采对合九铁路的安全影响分析。根据分析 结果,爆破作业安全允许振动速度、最大段起爆药量、爆破安全允许距离、爆破振动满足要求,不会 对合九铁路造成安全威胁。

关键词: 露天爆破, 振动速度, 回归计算, 安全影响

Abstract: On the north side of Biandanshan Mine,there are buildings and structures such as Anqing branch line of Hefei Jiujiang Railway and civilian houses. In order to protect the safety of railway and civil⁃ ian houses,the types,distribution,severity and potential accident hazards of seismic effects,blasting fly⁃ ing stones,blasting air shock wave,blasting and production dust and other dangerous and harmful factors produced in the blasting process are analyzed,and the safety and reliability of relevant blasting parameters for the operation of Hefei Jiujiang Railway are analyzed. According to the geographical relationship be⁃ tween the open-pit mining area and Hefei Jiujiang railway and the on-site operation conditions,blast um blasting vibration tester is used to conduct blasting tests on the test points arranged on the site. According to the blasting test results,the blasting attenuation coefficient is calculated by regression,the blasting engi⁃ neering level is determined,and the blasting vibration speed,blasting impact and blasting flying stone and other safety distances produced by the open-pit blasting operation are calculated. According to the relevant technical standards and specifications,the safety impact analysis of the open-pit blasting mining in the northeast of the mining area on Hefei Jiujiang Railway is carried out. According to the analysis results,the safety allowable vibration speed of blasting operation,the maximum detonating charge,the safety allow⁃ able distance of blasting and blasting vibration meet the requirements,and will not pose a safety threat to Hefei Jiujiang Railway.

Key words: open-pit blasting, vibration speed, regression calculation, security impact