Modern Mining ›› 2012, Vol. 28 ›› Issue (10): 15-17.
Previous Articles Next Articles
Li Zhenzhen
Online:
Published:
Abstract: Aiming at the requirement of transition period of Axi Gold Mine of Xinjiang, isolation layer thickness of transition period was calculated by adopted five different kinds of transition layer thickness calculation method, isolation layer thickness which met the production requirement of Axi gold mine was confirmed after each calculation result consideration.
Key words: Isolation layer, Deep filling mining method, Transition period mining
LI Zhen-Zhen. Isolation Layer Thickness Confirmation of Mining Transition Period of Axi Gold Mine[J]. Modern Mining, 2012, 28(10): 15-17.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.xdky.net/EN/
https://www.xdky.net/EN/Y2012/V28/I10/15