Modern Mining ›› 2020, Vol. 36 ›› Issue (11): 63-65.
Previous Articles Next Articles
WANG Zhongqiang1 ZHANG Jun1 WEI Fuhai1 SUN Yuan1 JU Weiwei2
Online:
Published:
Abstract: In the development engineering design of Luohe Iron Mine,in order to reduce the mining dilution rate,the mining preparation engineering is arranged at the level of -497 m,resulting in the loss of the triangular ore body left in the lower part.Through the design of -512 m shallow mining house,the 120 000 tons of triangular ore under the pressure of 259# stage stope is recovered to reduce the dilution;the level of -455 m is the level of drilling and return air,during the construction period,the waste rock is piled up by the onsite roadway,making -455 m roadway in 80~90 Lane area of 55 m level is occupied by waste rock,and the passage is blocked,which seriously affects the ventilation of the site and the passage of personnel and equipment.By using 259# stope cutting patio as waste rock filling well,a large amount of waste rock piled up in the upper -455 m horizontal 70~100 lane and 28~33 access area roadway is filled to -512 m shallow goaf.Through innovative application,it not only recovers the corner ore body and improves the recovery rate of resources,but also solves the problem that the waste rock in -455 m horizontal drilling roadway can not be treated for a long time,and the mining cost is greatly reduced by using the solid waste filling compared with the tailings cemented filling.
Key words: corner orebody,shallow mining design,overburden ore volume,solid waste filling,reduce dilution
WANG Zhongqiang ZHANG Jun WEI Fuhai SUN Yuan JU Weiwei. Innovative Application of Combination of Shallow Mining Design and Solid Waste Filling[J]. Modern Mining, 2020, 36(11): 63-65.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.xdky.net/EN/
https://www.xdky.net/EN/Y2020/V36/I11/63