Modern Mining ›› 2013, Vol. 29 ›› Issue (11): 14-16+20.
Previous Articles Next Articles
Chen Shanle1,2,Wang Huajun1
Online:
Published:
Abstract: In order to prevent or reduce the influene of mining on the environment and other resources as much as possible and obtain the best economic and social benefits.Taking the 3#,4# Coal Seam Mining for instance,the layout working face of strip mining is discussed.The surface subsidence of different mining methods of 3#,4# Coal Seam is predicted by using the probability integral method,and the filling paramters of goaf is determined.
Key words: Building group, Complicated fault, Goaf, Filling strip mining
CHEN Shan-Le, WANG Hua-Jun. Research on the Filling Strip Mining Technology of Inclined Coal Seam of Complicated Fault under Building Group[J]. Modern Mining, 2013, 29(11): 14-16+20.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.xdky.net/EN/
https://www.xdky.net/EN/Y2013/V29/I11/14