Welcome to Metal Mine! Today is Share:
×

扫码分享

Modern Mining ›› 2013, Vol. 29 ›› Issue (10): 54-55.

Previous Articles     Next Articles

Rsearch on the Calculation Method of Tailings Deposited Beach Gradient

Ju Weiwei1,Xu Zhongan2,Wang Bo3   

  1. 1.Sinosteel Maanshan Institute of Mining Research Co.,Ltd.;2.Jianke Engineering Quality Test Institute of Dangtu County;3.Chongqing Research Institute of China Coal Technology & Engineering Group Corporation
  • Online:2013-10-16 Published:2013-11-28

Abstract: The deposited beach gradient is the important parameter of tailings pond design and operation process.At present,there is no proper method to calculate the deposited beach gradient of new tailings pond. So,a new calculation method based on many factors is introduced so as to compute the deposited beach gradient in this paper. Some relative experimental results show that the performance of the method is good and the method is a reasonable and reliable thinking to deal with calculating the deposited beach gradient.

Key words: Tailings, Deposited beach gradient, Calculation method