Welcome to Metal Mine! Today is Share:
×

扫码分享

Modern Mining ›› 2013, Vol. 29 ›› Issue (07): 11-13+25.

Previous Articles     Next Articles

Numerical Simulation on Stoping Process of a Gold Mine

Wang Changxin1,Wang Zhanjun2   

  1. 1.No.1 Geological Brigade of Bureau of Geological Exploration of Xinjiang;2.Xinjiang Tian Hua Mining Industry Co., Ltd.
  • Online:2013-07-15 Published:2013-08-22

Abstract: Aimed at steep-thin vein of a gold mine, stress evolutionary processes of stope and surrounding rock were simulated by ANSYS and ABAQUS numerical simulation software when bilateral contact tunnel and unilateral contact tunnel to stope ore was used separately. Stress evolution result indicates that using bilateral contact road mining method is more beneficial to dilution, loss and safety management of mine than unilateral contact road.

Key words: Gold mining, Numerical simulation, Stress distribution, Evolutionary process