Modern Mining ›› 2013, Vol. 29 ›› Issue (06): 19-22.
Previous Articles Next Articles
Sun Hao1,Wang Linghui1,Zhu Jun2,Zhang Jun2
Online:
Published:
Abstract: As one of the first mines which step into deep mining in China, Dongguashan copper mine uses open stope back-filling mining method with “one partition one” recovery order, therefore mining preparatory tunnel in pillar stope often under high stress. To solve the engineering problem of cracks existing in the reinforced concrete supporting structure of mining preparatory tunnel of Dongguashan pillar stope, combined with practical situation of site tunnel, a structural mechanics analysis model was created. Internal force was analyzed with support structure, and formation reason of crack was found. In the end, some reasonable engineering countermeasures and suggestions are proposed.
Key words: Mining preparatory tunnel, Reinforced concrete sustained and protection, Structural mechanics, Stability
SUN Hao, WANG Ling-Hui, ZHU Jun, ZHANG Jun. Stability Analysis of Reinforced Concrete Sustained and Protection of Mining Preparatory Tunnel in Dongguashan Copper Mine[J]. Modern Mining, 2013, 29(06): 19-22.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.xdky.net/EN/
https://www.xdky.net/EN/Y2013/V29/I06/19