某铁矿副立井穿越多层承压含水层探测-注浆协同技术研究

俞 辉 施云峰 姜志富 周红波 沈士通   

  1. 中煤第三建设集团二十九工程处
  • 出版日期:2026-09-25 发布日期:2026-10-13

Research on Detection‑Grouting Collaborative Technology for Auxiliary Shaft Passing Through Multi‑layer Confined Aquifers in an Iron Mine

YU Hui SHI Yunfeng JIANG Zhifu ZHOU Hongbo SHEN Shitong   

  1. 29th Engineering Department of CCTCG
  • Online:2026-09-25 Published:2026-10-13

摘要: 针对立井穿越多层承压含水层施工过程中突水淹井、围岩失稳等突出安全风险,以泥 河铁矿副立井为工程依托,采用理论分析与工程实践相结合的研究手段,基于水动力学与注浆动力 学耦合理论,构建“物探精准识别-工作面高压注浆封堵-壁后注浆填充”的分阶治理理论框架,厘清各 工序阶段的技术衔接逻辑与协同作用机制。采用瞬变电磁法结合全空间全区视电阻率反演算法,实 现多层承压含水层及高风险突水通道的空间定位,物探低阻异常与钻探出水点综合吻合度达 91.7%。 在此基础上,采用滤水层-止浆垫配套工艺与注浆参数动态调控技术,实施多阶段工作面预注浆,并通 过壁后注浆完成井壁微裂隙二次加固。工程实践结果表明:78.27 m3 /h工作面最大单孔涌水量得到有 效控制,各注浆段竣工后工作面涌水量均稳定在 4 m3 /h 以下;壁后注浆治理后,井壁淋水量由最大 6.13 m3 /h降至 1.5 m3 /h以内。该技术体系实现主突水通道封堵与井壁微裂隙渗漏精细化治理,形成 “主通道封堵+微裂隙填充”双层防护结构,可为复杂水文地质条件下深部立井安全高效施工提供技 术参考。

关键词: 立井, 多层承压含水层, 瞬变电磁法, 工作面预注浆, 壁后注浆

Abstract: In view of the outstanding safety risks such as water inrush,well flooding and surrounding rock instability during the construction of the vertical shaft crossing the multi-layer confined aquifer,based on the auxiliary shaft of an iron mine,the theoretical analysis and engineering practice are combined. Based on the coupling theory of hydrodynamics and grouting dynamics,the theoretical framework of "pre⁃ cise identification of geophysical prospecting-high pressure grouting plugging of working face-grouting fill⁃ ing behind wal" is constructed,and the technical connection logic and synergistic mechanism of each pro⁃ cess stage are clarified. The transient electromagnetic method combined with the whole space and whole ar⁃ ea apparent resistivity inversion algorithm is used to realize the spatial positioning of multi-layer confined aquifer and high-risk water inrush channel. The comprehensive coincidence degree between geophysical low resistance anomaly and drilling water outlet point is 91.7%. On this basis,the pre-grouting of multi�stage working face is carried out by using the matching technology of filter layer-slurry stopping pad and the dynamic control technology of grouting parameters,and the secondary reinforcement of micro-cracks in shaft wall is completed by grouting behind the wall. The engineering practice results show that 78.27 m3 /h maximum single hole water inflow of the working face is effectively controlled,and the water inflow of the working face is stable below 4 m3 / h after the completion of each grouting section. After the treatment of grouting behind wall,the amount of water leaching from the wall is reduced from the maximum 6.13 m3 less than 1.5 m3 /h. The technical system realizes the fine treatment of the main water inrush channel plug⁃ ging and the micro-fracture leakage of the borehole wall,and forms a double-layer protective structure of "main channel plugging+micro-fracture filling" which can provide technical reference for the safe and effi⁃ cient construction of deep shafts under complex hydrogeological conditions.

Key words: shaft, multi-layer confined aquifers, transient electromagnetic method, working face pre-grouting, grouting behind wall