摘要: 在矿山采用阶段矿房嗣后充填法开采形成采空区后,尾砂胶结充填前,为解决可能 存在地顶板坍塌、矿柱失稳等安全隐患问题,首先通过数字近景摄影与人工实测相结合的方法, 收集围岩特性数据,再采用Q 系统分级方法,评价采空区及周边岩体质量等级。其次,采用矿柱应 力计算公式、Bieniawski 经验公式等分析评估矿柱稳定性,并运用Barton 极限跨度分析法和 Mathews 稳定图法量化顶板稳定性风险。最后,结合矿柱、顶板跨度和顶板暴露面积3 个子因素的 稳定性分析评价结果,采用最不利原则,确定采空区风险级别,并采用“强采、强出、强充”的矿房 开采及采空区治理的安全管控原则,保障生产安全。研究结果表明:马坑铁矿采用最不利原则, 在岩体质量等级Ⅲ级的最不利岩体中,综合判定采空区的安全风险等级为矿房开采长度≤48 m 时,采空区为低风险;48 ~100 m 时为一般风险。采用安全管控原则后,缩短回采周期并及时进行 尾砂胶结充填接顶,在采空区体积最大的67-7R-1 单元应用,6.5 个月后完全出空该矿房,经三维 扫描分析,采空区实际垮塌体积占设计体积的3 .8%,实现马坑铁矿安全稳定高效开采。

关键词: 采空区, 风险定量分级, 岩体质量分级, Barton, 极限跨度分析法, Mathews, 稳定图法

Abstract: After the mining in the mine adopts the staged ore chamber backfilling method to form the collapse area,and before the tailings are cemented and filled,in order to solve the potential safety hazards such as roof collapse and pillar instability,firstly,the surrounding rock characteristics data are collected through the combination of digital close-range photography and manual measurement.Then,various meth⁃ ods such as Q system classification are used to evaluate the quality grade of the collapse area and its sur ⁃ rounding rock mass.Secondly,the stability of the pillars is analyzed and evaluated by using pillar stress calculation formulas,Bieniawski empirical formulas,etc.,and the roof stability risk is quantified by using Barton ultimate span analysis method and Mathews stability diagram method.Finally,based on the stabili⁃ ty analysis and evaluation results of the three sub-factors of pillar,roof span,and roof exposure area,the risk level of the collapse area is determined by the most unfavorable principle,and the safety control prin⁃ ciples of "strong mining,strong extraction,and strong filling"for the ore chamber mining and collapse ar⁃ ea treatment are adopted to ensure production safety.The research results show that in the Makeng Iron Mine,by applying the most unfavorable principle,when the rock mass quality grade is grade III and the most unfavorable rock mass is considered,the comprehensive determination of the safety risk level of the collapse area is as follows:when the mining length of the ore chamber is ≤48 m,the collapse area is of low risk.When it is 48 ~100 m,it is of general risk.After applying the safety control principles,the mining cy⁃ cle is shortened and the tailings cementation and roof backfilling to reinforce are carried out in time.In the application of the largest goaf volume of 67-7R-1 unit,after 6.5 months,the mine chamber is completely emptied,and through three-dimensional scanning analysis,the actual collapse volume of the goaf ac⁃ counts for 3.8%of the designed volume,achieving safe,stable,and efficient mining of Makeng Iron Mine.

Key words: goaf, risk quantitative classification, rock mass quality classification, Barton limit span analysis method, Mathews stability chart method