梧桐庄矿182605下运料巷高水充填沿空留巷技术实践

霍雷雷   

  1. 冀中能源股份有限公司
  • 出版日期:2025-06-25 发布日期:2025-08-01

Practice of High Water Filling Gob-side Entry Retaining in 182605 Lower Meterial Transport Roadway of Wutongzhuang Mine

  1. Jizhong Energy Resources Co.,Ltd.
  • Online:2025-06-25 Published:2025-08-01

摘要: 为提高煤炭资源回采率,缓解梧桐庄矿采掘接替紧张局面,在梧桐庄矿182605下运料 巷开展高水充填沿空留巷技术实践。通过超前加固支护、高水充填和切顶卸压等技术,显著增加了 巷道支护强度,提高了巷道抵抗变形和破坏的能力。182605下运料巷沿空留巷围岩两帮平均收敛值 降低到了 227.8 mm,顶底板平均移近量降低到了 274 mm,有效维护了沿空留巷的稳定,保证了巷道 通风、运输、行人的安全;研究提出了高水材料注浆断电反冲洗技术,有效解决了因突然断电导致注 浆料凝固堵塞管路问题,提高了工作效率,并节约材料费约14万元。182605下运料巷高水充填沿空 留巷的开展,减少了巷道掘进量,提高煤炭资源回收2.5万t,经济创效5 000万元,182605下与182605 工作面中间巷道运用高水材料沿空留巷技术,实现工作面“Y”型通风,改善了工人作业环境,实现无 煤柱开采,缓解采掘接续紧张局面,杜绝了煤炭资源浪费,对煤矿的可持续发展具有重要应用价值, 为高水充填沿空留巷技术的发展和推广应用提供参考。

关键词: 高水充填, 沿空留巷, 反冲洗技术, 巷道稳定

Abstract: To improve the recovery rate of coal resources and alleviate the tense situation of mining and excavation succession in Wutongzhuang Mine,a technical practice of high water filling gob-side entry retaining was carried out in the lower material transportation roadway 182605 of Wutongzhuang Mine. Through technologies such as advanced reinforcement and support,high-water filling and roof cutting and pressure relief,the support strength of the roadway has been significantly increased,and the ability of the roadway to resist deformation and damage has been enhanced. The average convergence values of the sur⁃ rounding rocks on both sides of the 182605 lower material transportation roadway gob-side entry retaining have decreased to 227.8 mm,and the average approach of the top and bottom plates has decreased to 274 mm. This effectively maintains the stability gob-side entry retaining and ensures the ventilation,transporta⁃ tion and pedestrian safety of the roadway. The research proposed the power-off backwashing technology for grouting of high-water materials,effectively solving the problem of the grouting material solidifying and blocking the pipeline due to sudden power failure,improving work efficiency,and saving about 140 000 yu⁃ an in material costs. The implementation of high-water filling gob-side entry retaining in the 182605 lower material transportation roadway has reduced the tunneling volume,increased the recovery of coal resources by 25 000 t,and created an economic benefit of 50 million yuan. The application of high-water material gob-side entry retaining technology in the middle roadway between the 182605 lower and 182605 working face has achieved "Y" -shaped ventilation in the working face,improving the working environment for work⁃ers,realizing coal pill-free mining,alleviating the tense situation of mining and excavation succession, eliminating the waste of coal resources,which has important application value for the sustainable develop⁃ ment of coal mines,and provides a reference for the development and promotion and application of high wa⁃ ter filling gob-side entry retaining technology.

Key words: high water filling, gob-side entry retaining, backwashing technology, roadway stability