欢迎访问《现代矿业》杂志官方网站,今天是 分享到:
×

扫码分享

现代矿业 ›› 2026, Vol. 42 ›› Issue (09): 41-48.

• 采矿工程 • 上一篇    下一篇

基于Mathews图表法与FLAC3D的采场结构参数优化

周昭成1 韦天禄1 王 沉2 王 威2 龙绍亮2 王明飞2   

  1. 1. 贵州磷化(集团)有限责任公司;2. 贵州大学矿业学院
  • 出版日期:2026-09-25 发布日期:2026-10-10

Optimization of Stope Structure Parameters Based on Mathews Chart Method and FLAC3D

ZHOU Zhaocheng1 WEI Tianlu1 WANG Chen2 WANG Wei2 LONG Shaoliang2 WANG Mingfei2   

  1. 1. Guizhou Phosphate Chemical (Group) Co.,Ltd.;2. Mining College of Guizhou University
  • Online:2026-09-25 Published:2026-10-10

摘要: 深部磷矿机械化开采受地应力升高、岩体破碎等条件影响,采场暴露跨度极易诱发顶 板冒落、矿柱失稳等灾害,合理优化采场结构参数是保障安全高效开采的关键。以贵州某深部磷矿 为工程背景,针对悬臂式掘进机截割嗣后充填采矿工艺,综合采用现场地质调研、多方法岩体质量评 价、Mathews稳定性图表法与FLAC3D数值模拟开展采场参数优化研究。通过RMR、IRMR、MRMR分 级方法,完成矿岩质量判定,顶板白云岩与磷矿层为Ⅲ级中等岩体,底板硅质岩为Ⅱ~Ⅲ级中-良岩体。 基于Mathews理论,计算明确采场稳定性分区阈值,稳定区、无支护过渡区临界水力半径分别为5.30, 8.70 m。固定采场长度50 m,设置10~15 m共6种跨度工况进行数值模拟对比,分析围岩应力、顶板位 移及变形演化规律,发现14 m跨度采场扰动最显著,15 m跨度稳定性略有回升,但安全储备不足。综 合优选得到最优采场结构参数为长度50 m,跨度10 m,该参数下采场应力集中弱、顶板变形量最小。 现场工业试验验证,优化参数可有效抑制围岩剪切破坏与顶板冒落,围岩整体稳定性良好,可为同类 深部磷矿机械化开采参数设计提供参考。

关键词: 深部磷矿, 采场结构参数, Mathews图表法, 数值模拟, 围岩稳定性

Abstract: The mechanized mining of deep phosphate rock is affected by the conditions such as the in⁃ crease of ground stress and the fragmentation of rock mass. The exposed span of the stope can easily induce disasters such as roof caving and pillar instability. Reasonable optimization of the structural parameters of the stope is the key to ensure safe and efficient mining. Taking a deep phosphate mine in Guizhou as the en⁃ gineering background,aiming at the cutting and subsequent filling mining technology of cantilever road⁃ header,the field geological investigation,multi-method rock mass quality evaluation,Mathews stability chart method and FLAC3D numerical simulation were used to carry out the optimization of stope parameters. Through RMR,IRMR and MRMR classification methods,the quality of ore and rock is determined. The roof dolomite and phosphate rock are grade III medium rock mass,and the floor siliceous rock is grade II~III medium-good rock mass. Based on Mathews theory,the stability zoning threshold of the stope is cal⁃ culated,and the critical hydraulic radii of the stable zone and the unsupported transition zone are 5.30 m and 8.70 m,respectively. The length of the fixed stope is 50 m,and a total of 6 span conditions of 10~15 m are set for numerical simulation comparison. The evolution laws of surrounding rock stress,roof displace⁃ ment and deformation are analyzed. It is found that the disturbance of the 14 m span stope is the most signifi⁃ cant,and the stability of the 15 m span is slightly rebounded but the safety reserve is insufficient. The opti⁃ mal stope structure parameters obtained by comprehensive optimization are 50 m in length and 10 m in span.Under these parameters,the stress concentration of the stope is weak and the roof deformation is the small⁃ est. The field industrial test verifies that the optimized parameters can effectively inhibit the shear failure of surrounding rock and roof caving,and the overall stability of surrounding rock is good,which can provide reference for the design of mechanized mining parameters of similar deep phosphate mines.