欢迎访问《现代矿业》杂志官方网站,今天是 分享到:
×

扫码分享

现代矿业 ›› 2026, Vol. 42 ›› Issue (09): 159-164.

• 岩土工程 • 上一篇    下一篇

贵州某煤矿大倾角大采高松软煤层采动巷道围岩力学研究

孙光裕1 周涛涛1 杨齐聪2 杜广盛3 敖以章4   

  1. 1. 六盘水师范学院矿业与机械工程学院;2. 贵州邦达能源开发有限公司; 3. 山西工程技术学院矿业工程系;4. 贵州贵能投资股份有限公司攀枝花煤矿
  • 出版日期:2026-09-25 发布日期:2026-10-13

Research on Surrounding Rock Mechanics of Mining Roadway in Soft Coal Seam with Large Dip Angle and Large Mining Height in a Coal Mine in Guizhou

SUN Guangyu1 ZHOU Taotao1 YANG Qicong2 DU Guangsheng3 AO Yizhang4   

  1. 1. College of Mining and Mechanical Engineering,Liupanshui Normal University;2. Guizhou Bangda En⁃ ergy Development Co.,Ltd.; 3. Faculty of Mining Engineering,Shanxi Institute of Technology; 4. Panzhi⁃ hua Coal Mine,Guizhou Guineng Investment Co.,Ltd.
  • Online:2026-09-25 Published:2026-10-13

摘要: 为了有效改善贵州省煤矿顶板事故多发的局面,以贵州六盘水攀枝花煤矿 7# 煤层及 11074工作面为研究对象,开展采动巷道围岩应力研究。对7# 煤层顶板开展力学参数试验研究,发现 浸水饱和后的顶板岩样试件比自然烘干岩样单轴抗压强度、弹性极限、屈服强度、强度极限、单轴抗 拉强度分别降低了 19.51%、29.52%、63.38%、39.77%、20%,而在抗剪强度上,同一种试样在剪切角度 增加时,破坏荷载将减小,同一剪切角度下试样浸水后,黏聚力会降低而内摩擦角会增高。通过 FLAC3D对贵州六盘水攀枝花煤矿 11074工作面进行底板岩体应力分布规律数值模拟,结果发现,当 煤柱一侧采空时,随着垂距的增加,应力峰值逐渐向远离煤柱中心距离的后方转移,垂直应力变化速 率较低,垂直应力峰值趋于稳定变化;当煤柱双侧采空时,随着距离煤柱垂直距离的增加,应力峰值 逐渐向远离煤柱中心的前方位置转移,应力峰值逐渐趋于稳定且小幅度的增加;当煤柱双侧采空且 煤柱宽度为原留设煤柱宽度的2倍时,随着与煤柱的垂直距离增加,下方岩层的应力变化逐渐趋于稳 定,煤柱对底板应力分布影响程度进一步减小。

关键词: 大倾角大采高松软煤层, 力学参数试验, 围岩应力分布, 数值模拟

Abstract: In order to effectively improve the situation of frequent roof accidents in coal mines in Gui⁃ zhou Province,the 7# coal seam and 11074 working face of Panzhihua Coal Mine in Liupanshui,Guizhou Province were taken as the research object to study the surrounding rock stress of mining roadway. The exper⁃ imental study on the mechanical parameters of the roof of 7# coal seam was carried out. It was found that the uniaxial compressive strength,elastic limit,yield strength,strength limit and uniaxial tensile strength of the roof rock specimen after soaking saturation were 19.51%,29.52%,63.38%,39.77% and 20% lower than those after natural drying. In terms of shear strength,the failure load of the same specimen will de⁃ crease when the shear angle increases,and the cohesion of the specimen will decrease and the internal fric⁃ tion angle will increase after soaking at the same shear angle. The numerical simulation of stress distribution law of floor rock mass in 11074 working face of Panzhihua Coal Mine in Liupanshui,Guizhou Province was carried out by FLAC3D . The results showed that when one side of coal pillar was mined out,with the increase of vertical distance,the peak stress gradually shifted to the rear away from the center of coal pillar,the change rate of vertical stress was low,and the peak value of vertical stress tended to be stable. When the coal pillar is mined out on both sides,with the increase of the vertical distance from the coal pillar,the peak stress gradually shifts to the front position away from the center of the coal pillar,and the peak stress gradu⁃ ally tends to be stable and increases slightly. When the coal pillar is mined on both sides and the width of the coal pillar is twice the width of the original coal pillar,with the increase of the vertical distance from the coal pillar,the stress change of the lower rock stratum gradually tends to be stable,and the influence of the coal pillar on the stress distribution of the floor is further reduced.

Key words: soft coal seam with large dip angle and large mining height, mechanical parameter test, surrounding rock stress distribution, numerical simulation