现代矿业 ›› 2026, Vol. 42 ›› Issue (04): 61-66,75.

• 采矿工程 • 上一篇    下一篇

基于FLAC3D 的某铁矿充填采场结构参数优化与稳定性评价

朱金文1 董亚宁1 刘 康1 刘 宾2 李铭涵2   

  1. 1 .安徽马钢矿业资源集团姑山矿业有限公司钟九矿业分公司;2.中南大学资源与安全工程学院
  • 出版日期:2026-04-25 发布日期:2026-05-08

Structural Parameter Optimization and Stability Evaluation of Filling Stope in an Iron Mine Based on FLAC3D

  1. 1 .Zhongjiu Mining Branch of Gushan Mining Co.,Ltd.,Anhui Masteel Mining Resources Group; 2.School of Resources and Safety Engineering,Central South University
  • Online:2026-04-25 Published:2026-05-08

摘要: 钟九铁矿浅部矿岩软弱、破碎,传统分段空场嗣后充填采矿法面临严重垮冒风险。 为提高开采安全性与效率,针对下向进路充填采矿法,采用FLAC3D 有限元数值模拟,分析了不同进 路宽度(4 .0 ~5.0 m)、高度(3 .8 ~5.0 m)条件下人工假顶与矿柱的应力、位移动态变化,以安全系数 (极限抗拉强度与最大拉应力之比)评价采场稳定性。结果表明:采场最大位移和最大拉应力随进 路宽度、高度增加而增大,原岩矿柱安全系数为0.86 ~1.25,人工假顶安全系数为1.37 ~1.86;二步骤 回采时各方案安全系数均大于1.0。综合考虑安全性与回采效率,推荐采场结构参数为宽4 .5 m、高 4 m(方案5),该方案下人工假顶安全系数为1.53,满足稳定性要求。研究结果为钟九铁矿采场结 构参数优化提供了科学依据。

关键词: 下向进路充填采矿法, 采场结构参数, FLAC3D , 安全系数, 稳定性分析

Abstract: The shallow ore rock in Zhongjiu Iron Mine is weak and broken,and the traditional sub⁃ level open stoping with subsequent filling mining method faces a serious risk of collapse.In order to im ⁃ prove the safety and efficiency of mining,aiming at the downward drift filling mining method,FLAC3D fi⁃ nite element numerical simulation is used to analyze the dynamic changes of stress and displacement of ar ⁃ tificial false roof and pillar under different drift width (4 .0 ~5.0 m)and height (3 .8 ~5.0 m).The safety factor (ratio of ultimate tensile strength to maximum tensile stress)is used to evaluate the stability of stope.The re⁃ sults show that the maximum displacement and maximum tensile stress of the stope increase with the in ⁃ crease of the width and height of the approach.The safety factor of the original rock pillar is 0.86 ~1.25, and the safety factor of the artificial false roof is 1.37 ~1.86.The safety factor of each scheme is greater than 1.0 in the two-step mining.Considering the safety and mining efficiency,the recommended stope structure parameters are 4.5 m wide and 4 m high (Scheme 5).The safety factor of artificial roof under this scheme is 1.53,which meets the stability requirements.The research results provide a scientific basis for the optimi ⁃ zation of stope structure parameters in Zhongjiu Iron Mine.

Key words: downward drift filling mining method, stope structure parameters, FLAC3D, factor of safe? ty, stability analysis