欢迎访问《现代矿业》杂志官方网站,今天是 分享到:
×

扫码分享

现代矿业 ›› 2026, Vol. 42 ›› Issue (04): 39-43,49.

• 采矿工程 • 上一篇    下一篇

大型深凹露天矿山高效掘沟爆破技术研究与应用

李兰彬   

  1. 本溪钢铁(集团)矿业有限责任公司石灰石矿
  • 出版日期:2026-04-25 发布日期:2026-05-08

Research and Application of Efficient Trenching Blasting Technology for Large Deep Open-pit Mines

  1. Limestone Mine of Benxi Iron &Steel (Group)Mining Co.,Ltd.
  • Online:2026-04-25 Published:2026-05-08

摘要: 大型深凹露天矿山掘沟爆破作业中,为解决经常面临的爆堆松散度不足、爆区后冲 现象显著、爆破振动强度高于其他作业区域等问题,结合南芬露天矿和石灰石矿的实际爆破案例, 从穿孔方式与爆破参数优化两方面着手,创新应用爆破技术。在穿孔方式选择上,对比分析垂直 炮孔与倾斜炮孔的适用场景,并在此基础上,通过3 项核心技术手段提升效果。一是充分利用上部 自由面,引导爆破能量向预定方向释放,减少无效冲击;二是合理控制延期时间,采用毫秒延时起 爆技术,使相邻炮孔依次起爆,降低相互干扰,提升爆堆分散度;三是严格控制同时段起爆药量,将 单段起爆药量控制在安全阈值内,从源头削减爆破振动强度。应用结果显示,该技术的实施带来 了显著成效,使铲装效率提高约30%,爆破后冲距离由8 ~10 m 降低到2 ~5 m,松散度可达1.4 ~1.5, 爆破振动强度降低30%以上,有效保护了周围边坡的稳定性,大幅减轻了对周边重要建筑物及居 民区的影响,创造了可观的经济效益,为大型深凹露天矿山的安全高效开采提供了有力支撑。

关键词: 深凹露天矿山, 掘沟工程爆破, 垂直孔, 倾斜孔

Abstract: In the trenching blasting operations of large deep open-pit mines,to address the common problems such as insufficient looseness of the blasting piles,significant post-blast erosion,and higher blasting vibration intensity compared to other operation areas,based on the actual blasting cases of Nanfen Open-pit Mine and Limestone Mine,the blasting technology was innovatively applied by focusing on the optimization of the blasting parameters and the blasting method.In the selection of the blasting method, the applicable scenarios of vertical blast holes and inclined blast holes were compared and analyzed,and on this basis,three core technical means were adopted to improve the effect.First,the upper free surface was fully utilized to guide the blasting energy to be released in the predetermined direction,reducing inef⁃ fective impacts.Second the delay time,was reasonably controled,and adopted the millisecond delay initia ⁃ tion technology to make adjacent blast holes ignite successively,reducing mutual interference and improv ⁃ ing the dispersion degree of the blasting pile.Third,strictly controled the amount of explosives detonated simultaneously,was the single-stage detonation amount within the safety threshold was bept,reducing the blasting vibration intensity from the source.The application results show that the implementation of this technology has brought significant benefits,increasing the bucketing efficiency by approximately 30%,re⁃ ducing the post-blast erosion distance from 8 ~10 m to 2 ~5 m,achieving a dispersion degree of 1.4 ~1.5, reducing the blasting vibration intensity by more than 30%,effectively protecting the stability of the sur⁃ rounding slopes,significantly reducing the impact on important buildings and residential areas around, creating considerable economic benefits,and providing strong support for the safe and efficient mining of large deep and deep-cut open-pit mines.

Key words: large deep open-pit mines, ditching blasting, vertical holes, inclined holes