某矿山回采过渡阶段-420 m 中段以下地应力分布规律研究

杨双有1 林 敏1 王 瑞2 陈久吾1   

  1. 1 .安徽庐江龙桥矿业股份有限公司;2.赣南科技学院
  • 出版日期:2026-04-25 发布日期:2026-05-06

Research on Distribution Law of Ground Stress in the -420 m Section and Below of Mining Transition Stage of a Mine

  1. 1 .Anhui Lujiang Longqiao Mining Co.,Ltd.;2.Gannan University of Science and Technology
  • Online:2026-04-25 Published:2026-05-06

摘要: 龙桥铁矿处于回采过渡阶段,为保证深部采场回采的稳定性,采用空心包体应变法对 龙桥铁矿-420 m 中段以下地应力分布规律进行研究。研究结果表明:龙桥铁矿1#~6#测点最大主应力 分别为15.20,17.13,17.47,19.98,23.58,21.72 MPa,最大主应力总体为近水平方向;-437.5,-472.5 m 分层西区最大主应力大于东区最大主应力,-490 m 中段则相反,西区最大主应力小于东区最大主 应力,最大主应力最大的区域位于-490 m 中段西区,为23.58 MPa。龙桥铁矿原岩应力随埋深的增 加而不断增大,其中-490 m 较-472 .5 m 的增幅更大,表明矿区的地应力值较上覆岩土自重应力更 大,属于中等偏高;矿区地应力场同时受地质构造、岩性和矿体形态等多种因素的综合影响。根据 地应力分布规律,提出相应措施,为矿山安全生产提供依据。

关键词: 地应力, 最大主应力, 应力解除, 稳定性

Abstract: Longqiao Iron Mine is in the stage of transition from mining to caving.In order to ensure the stability of deep caving,the distribution law of ground stress below the -420 m section of Longqiao Iron Mine was studied by the method of hollow package body strain through field tests.The results of the study show that the maximum principal stress at the 1#to 6#measuring points of Longqiao Iron Mine is 15.20 MPa, 17.13 MPa,17.47 MPa,19.98 MPa,23.58 MPa and 21.72 MPa respectively,and the maximum principal stress is generally close to the horizontal direction.The maximum principal stress at the western area of the -437.5 m and -472.5 m sections is greater than that at the eastern area,while the opposite is true at the -490 m section,the maximum principal stress at the western area is less than that at the eastern area,and the area with the maximum principal stress is located at the western area of the -490 m section,with the maximum principal stress value of 23.58 MPa.The original rock stress of Longqiao Iron Mine increases con ⁃ tinuously with the increase of burial depth,among which the -490 m section has a greater increase com ⁃ pared with the -472.5 m section,indicating that the value of ground stress in the mine area is greater than the self-weight stress of the overlying rock and soil,which belongs to medium high ;the ground stress field in the mine area is also affected by the geological structure,rock type and the shape of the ore body and other factors.According to the distribution law of ground stress,corresponding measures are put forward to provide the basis for the safe production of the mine.