急倾斜薄矿脉深孔采矿方法结构参数优选

叶光祥1 邵海清2 周宝炉1 朱国华2 汪 杰1 宋伟萍2 郭成淋2   

  1. 1. 赣州有色冶金研究所有限公司;2. 江西下垄钨业有限公司
  • 出版日期:2026-03-25 发布日期:2026-04-07

Optimization of Structural Parameters for Deep Hole Mining Method of Steeply Inclined Thin Ore Veins

YE Guangxiang1 SHAO Haiqing2 ZHOU Baolu1 ZHU Guohua2 WANG Jie1 SONG Weiping2 GUO Chenglin2   

  1. 1. Ganzhou Nonferrous Metallurgy Research Institute Co.,Ltd.; 2. Jiangxi Xialong Tungsten Industry Co.,Ltd.
  • Online:2026-03-25 Published:2026-04-07

摘要: 为采用分段凿岩深孔落矿空场法替代传统浅孔留矿法,以实现急倾斜薄矿脉的高效 开采,重点研究优化采场结构参数,特别是间柱宽度和装矿进路间距的合理确定。基于原有浅孔留 矿法的工程实践,通过室内岩石力学试验,获取岩体力学参数,采用控制变量法,对间柱宽度和装矿 进路间距进行系统研究。运用 FLAC3D数值模拟软件,建立采场结构参数的三维数值模型,重点分 析不同参数组合下采场围岩的应力场分布特征、位移场演化规律及塑性区扩展范围。数值模拟结 果表明,间柱宽度和装矿进路间距的优化配置可显著改善采场围岩的应力状态,有效控制围岩变 形,并降低塑性区体积。基于采场稳定性分析和装矿进路安全性评估,最终确定间柱宽度5 m、装矿 进路间距 8 m 为最优采场结构参数。研究成果不仅为矿山安全生产提供了技术保障,同时为类似 地质条件下的急倾斜薄矿脉开采提供了重要工程参考。

关键词: 急倾斜薄矿脉, 深孔采矿方法, 采场结构参数

Abstract: To replace the traditional shallow hole retention mining method with the segmented drill‐ ing and deep hole ore-extraction open-pit method,in order to achieve efficient mining of steeply inclined thin ore veins,the focus is on optimizing the structural parameters of the mining area,especially the rea‐ sonable determination of the inter-pillar width and the spacing of the ore-loading routes. Based on the engi‐ neering practice of the original shallow hole retention mining method,through indoor rock mechanics ex‐ periments,the rock mechanical parameters were obtained,and the control variable method was used to conduct a systematic study on the inter-pillar width and the spacing of the ore-loading routes. Using the FLAC3D numerical simulation software,a 3D numerical model of the mining area structure parameters was established,and the stress field distribution characteristics,displacement field evolution laws,and plastic zone expansion ranges of the surrounding rock of the mining area under different parameter combinations were analyzed. The numerical simulation results show that the optimized configuration of the inter-pillar width and the spacing of the ore-loading routes can significantly improve the stress state of the surrounding rock of the mining area,effectively control the deformation of the surrounding rock,and reduce the volume of the plastic zone. Based on the stability analysis of the mining area and the safety assessment of the ore�loading routes,the optimal mining area structure parameters of 5 m inter-pillar width and 8 m ore-loading route spacing were finally determined. The research results not only provide technical support for the safety production of the mine,but also provide important engineering references for the mining of steeply inclined thin ore veins under similar geological conditions.

Key words: sharp dip thin vein, deep hole mining method, stope structure parameters