现代矿业 ›› 2026, Vol. 42 ›› Issue (01): 169-176,203.

• 岩土工程 • 上一篇    下一篇

某建筑用花岗岩矿露天采场高陡边坡稳定性分析

王二喜1 李尚福2 李锦想3 洪敦敏3 王 靖3   

  1. 1. 广州市顺兴石场有限公司;2. 马鞍山市应急管理局; 3. 中钢集团马鞍山矿山研究总院股份有限公司
  • 出版日期:2026-01-25 发布日期:2026-02-05

Analysis of High and Steep Slopes in an Open-pit Quarry of a Granite Mine for Construction Purposes

  1. 1. Guangzhou Shunxing Quarry Co.,Ltd.;2. Emergency Management Bureau of Maanshan City; 3. Sinosteel Maanshan General Institute of Mining Research Co.,Ltd.
  • Online:2026-01-25 Published:2026-02-05

摘要: 针对某建筑用花岗岩矿露天采场高陡边坡,综合分析边坡工程地质特征及具体开采 条件,选取各分区典型边坡剖面,采用赤平投影法对边坡潜在破坏模式进行分析,采用数值模拟对 地下水和降雨工况下的边坡稳定性进行初步分析。结合极限平衡法和 Midas/GTS 软件中有限元 强度折减法(SRM),对不同工况下的边坡稳定性进行系统性评价,提出相应的管理措施和建议。 研究结果表明,边坡发生整体大规模楔形体破坏的可能性较小,主要破坏模式为圆弧整体滑动和 小型楔形体 2种破坏模式;降雨后,坡体雨水入渗,浸润线有所提高。暴雨季节时,坡体浸润线升高 将影响边坡稳定性。矿山现状边坡处于稳定状态,风化岩层下部和深部开采坡脚位置易出现剪切 破坏。极限平衡法与有限强度折减法模拟的结果相吻合,表明多方法综合分析的有效性和合理 性。研究结果为该露天采场边坡稳定防护措施及建议的制定提供依据。

关键词: 露天采场, 边坡稳定性, 极限平衡法, 有限元强度折减法, 边坡防护

Abstract: In view of high and steep slopes in an open-pit quarry of a certain construction granite mine,a comprehensive analysis of the engineering geological characteristics and specific mining condi⁃ tions of the slopes was conducted. Typical slope sections in each zone were selected. The potential failure modes of the slopes were analyzed by using the red-flat projection method,and the stability of the slopes under groundwater and rainfall conditions was preliminarily analyzed by numerical simulation. Combining the limit equilibrium method and the finite element strength reduction method(SRM)in the Midas/GTS software,a systematic evaluation of slope stability under different working conditions is conducted,and corresponding management measures and suggestions are proposed. The research results show that the pos⁃ sibility of overall large-scale wedge-shaped failure of the slope is relatively small,and the main failure modes are two types: arc integral sliding and small wedge-shaped failure modes. After rainfall,rainwater seeped into the slope,and the infiltration line increased. During the rainy season,the rise of the slope in⁃ filtration line will affect the stability of the slope. The current slope of the mine is in a stable state. Shear failure is prone to occur at the lower part of the weathered rock strata and the foot of the deep mining slope. The simulation results of the limit equilibrium method and the finite intensity reduction method are consis⁃ tent,indicating the validity and rationality of the multi-method comprehensive analysis. The research re⁃ sults provide a basis for the formulation of slope stability protection measures and suggestions for this open�pit mining site.

Key words: open-pit mining area, slope stability, limit equilibrium method, finite element strength reduction method, slope protection