承压含水层上完整型煤层底板突水机制模拟

吴 焘1 王泽田2 华 伟1 郭林林1 朱 尧3   

  1. 1. 枣庄矿业(集团)有限责任公司滨湖煤矿;2. 山东科技大学地球科学与工程学院; 3. 山东唐口煤业有限公司
  • 出版日期:2025-11-25 发布日期:2025-12-23

Simulation of Water Inrush Mechanism of Complete Coal Seam Floor on Confined Aquifer

  1. 1. Binhu Coal Mine,Zaozhuang Mining (Group) Co.,Ltd.; 2. School of Earth Science and Engineering, Shandong University of Science and Technology;3. Shandong Tangkou Coal Industry Co.,Ltd.
  • Online:2025-11-25 Published:2025-12-23

摘要: 随着开采深度增加,采矿活动处的工程地质和水文地质条件越发复杂,底板水害防治 难度不断增大。采矿扰动下,承压含水层上完整型煤层底板突水机制目前尚不清楚,为了进一步研 究完整型煤层底板采动破坏及突水通道形成过程,揭示底板奥灰突水机制,以滨湖煤矿21605开采工 作面为研究对象,模拟分析了采动影响下煤层底板突水通道形成和奥灰承压水导升规律。结果表 明,工作面开采初期,底板岩层在矿山压力作用下出现微小裂隙,随开采范围扩大,裂隙不断发展,与 下部十四灰含水层连通;奥灰水在承压水压力作用下,沿隐伏裂隙递进导升至十四灰含水层,沟通工 作面底板破坏带,进而发生底板突水。将完整型煤层底板奥灰突水演化过程划分为递进补给、裂隙 扩展、渗透增加和通道形成4个阶段;提出承压含水层上完整型煤层底板“五带”,为底板采动破坏导 水带、采动裂隙增生带、完整岩层带、承压渗透增升带和承压原始导升带。

关键词: 地下开采, 底板突水, 突水机制, 数值模拟

Abstract: With the increase of mining depth,the engineering geological and hydrogeological condi⁃ tions of mining activities are more and more complex,and the difficulty of floor water disaster prevention and control is increasing.The water inrush mechanism of complete coal seam floor on confined aquifer under min⁃ ing disturbance is still unclear. In order to further study the mining failure of complete coal seam floor and the formation process of water inrush mechanism and reveal the mechanism of Ordovician water inrush from floor,taking 21605 mining face of Binhu Coal Mine as the research object,the formation of water inrush mechanism and the law of Ordovician confined water lifting under mining disturbance are simulated and ana⁃ lyzed.The results show that in the early stage of working face mining,small cracks appear in the floor strata under the action of mine pressure. With the expansion of mining scope,the cracks continue to develop and connect with the lower fourteen ash aquifers. Under the action of confined water pressure,the Ordovician limestone water is gradually guided along the hidden fissure to the fourteen limestone aquifer,which commu⁃ nicates the floor failure zone of the working face and then the floor water inrush occurs.The evolution process of Ordovician limestone water inrush from complete coal seam floor is divided into four stages of progressive recharge,fracture expansion,seepage increase and channel formation.The theory of "five zones" of complete coal seam floor above confined aquifer is put forward,which are floor mining failure water conduction zone, mining fracture hyperplasia zone,complete rock zone,confined seepage rise zone and confined original rise zone.

Key words: underground mining, water inrush of floor, water inrush mechanism, numerical simulation