某矿近距离临空掘进巷道支护工艺优化

孙尚旭1 范新宇2 殷博超2   

  1. 1. 中检集团公信安全科技有限公司; 2. 陕煤集团神南产业发展有限公司
  • 出版日期:2025-09-25 发布日期:2025-11-04

Optimization of Supporting Technology for Adjacent Gob-side Excavation Roadway in a Mine

  1. 1. CCIC Gongxin Security Technology Co.,Ltd.;2. Shennan Industrial Development Co.,Ltd.,Shaanxi Coal and Chemical Industry Group Co.,Ltd.
  • Online:2025-09-25 Published:2025-11-04

摘要: 为了降低小塔山煤矿 8304高抽巷上山掘进近距离过上覆 4# 煤层采空区时围岩出现破 碎现象,从施工工艺、煤层赋存、巷道布置以及采空区等方面分析了围岩破碎机理;对穿层段上覆软 化岩体采用穿层注浆固化,对顶板破碎煤体采用浅孔注浆加固,提高软岩顶板承载层强度;利用串帮 锚索对两帮易垮落煤柱进行超前控制,采用“联锁梯形棚+密集 U29型钢棚”等主、被动支护相结合, 对顶板进行加强支护。现场实际应用效果表明:采取联合支护后有效控制了上覆岩层受淋水软化影 响出现顶板破裂、下沉等现象,实测支护后煤层下沉量降低至0.17 m,支护失效率降低至4%,巷道修 复费用减少至 12.7万元,掘进速度提高至 4.8 m/d,解决了临空掘进巷道支护难度大、效果差、围岩变 形严重等技术难题,取得了显著应用成效。

关键词: 掘进巷道, 临空巷道, 顶板破碎, 支护工艺优化

Abstract: To reduce the surrounding rock fragmentation during the upward excavation of the 8304 high-level gas drainage roadway in Xiaotashan Coal Mine when it passes to the overlying No.4 coal seam goaf,the mechanism of surrounding rock fragmentation is analyzed from aspects of construction technolo⁃ gy,coal seam occurrence,roadway layout,and goaf. For the overlying softened rock mass in the cross-lay⁃ er section,cross-layer grouting solidification is adopted. For the broken coal mass in the roof,shallow hole grouting reinforcement is used to improve the strength of the bearing layer of the soft rock roof. Rib�penetrating cable anchors are utilized for advanced control of the easily collapsing coal pillars on both sides,and combined active and passive support such as "interlocked trapezoidal sheds + dense U29 steel sheds" is employed to strengthen the roof support. Field application effects show that after the implementa⁃ tion of the combined support,phenomena like roof cracking and subsidence caused by the softening of overlying rock layers due to water seepage are effectively controlled. The measured coal seam subsidence after support is reduced to 0.17 m,the support failure rate is lowered to 4%,the roadway repair cost is de⁃ creased to 127 000 yuan,and the excavation speed is increased to 4.8 m/d,which solves technical problems such as high support difficulty,poor effect,and severe surrounding rock deformation in roadways excavated adjacent to goafs,achievines significant application results.

Key words: excavation roadway, gob-side roadway, broken roof, optimization of supporting technolo? gy