摘要: 针对急倾斜磷矿开采过程中面临的安全隐患大、地质灾害风险高以及资源高效利用难 等问题,开展了磷矿开采充填系统研究与应用。首先根据该磷矿生产规模,计算日平均充填量和年 充填能力,为后续充填系统设计提供关键数据支撑。在充填浆料制备工艺方面,选用磷石膏作为充 填骨料,详细规划了充填物料的处理流程,根据废石破碎筛分、水泥储存输送、物料配比等,在搅拌机 中混合成合格浆体后输送至采场。同时构建了涵盖充填骨料破碎及筛分、充填料配料搅拌、充填料 输送3个部分的充填系统。结果显示,矿山平均充填量为626.3 m³/d,充填能力为20.67万m³/a。在充 填系统应用中,合理选择了ZBG80/8型充填工业泵等设备,通过精细的系统控制和完善的减压、压力 监测及排气设施设置,确保了充填作业的安全稳定。该充填方案在实际应用中成效显著,可全方位 助力矿山高效安全开采。

关键词: 急倾斜磷矿, 充填开采, 充填系统, 充填工艺, 充填材料

Abstract: In response to the problems such as significant safety hazards,high geological disaster risks and difficulties in efficient resource utilization faced in the process of sharply inclined phosphate rock mining,research and application of filling systems in phosphate rock mining have been carried out. First‐ ly,based on the production scale of this phosphate mine,the average daily filling volume and the annual filling capacity are calculated to provide key data support for the subsequent filling system design. In terms of the preparation process of the filling slurry,phosphogypsum was selected as the filling aggregate. The processing flow of the filling material was detailedly planned. According to the crushing and screening of waste rock,the storage and transportation of cement,and the material ratio,the qualified slurry was mixed in the mixer and then transported to the mining site. At the same time,a filling system covering three parts of crushing and screening of filling aggregates,batching and stirring of filling materials,and conveying of filling materials was constructed. The results show that the average filling volume of the mine is 626.3 m³/d and the filling capacity is 206 700 m³/a. In the application of the filling system,the ZBG80/8 type filling industrial pump and other equipment were reasonably selected. Through meticulous system con‐ trol and complete pressure reduction,pressure monitoring and exhaust facility settings,the safety and stabil‐ ity of the filling operation were ensured. This filling scheme has achieved remarkable results in practical ap‐ plications and can comprehensively assist in the efficient and safe mining of mines.