欢迎访问《现代矿业》杂志官方网站,今天是 分享到:
×

扫码分享

现代矿业 ›› 2025, Vol. 41 ›› Issue (07): 46-51.

• 采矿工程 • 上一篇    下一篇

甘肃岷县某金矿采矿方案优选

王 星1,2 赵 艳1,2 吴 旭1,2 孙国权1,2   

  1. 1. 中钢集团马鞍山矿山研究总院股份有限公司;2. 金属矿山开采安全与灾害防治全国重点实验室
  • 出版日期:2025-07-25 发布日期:2025-08-26

Mining Scheme Optimization of a Gold Mine in Minxian County,Gansu Province

  1. 1. Sinosteel Maanshan General Institute of Mining Research Co.,Ltd.; 2. State Key Laboratory of Metal Mining Safety and Disaster Prevention and Control
  • Online:2025-07-25 Published:2025-08-26

摘要: 针对甘肃岷县某金矿地质条件和开采需求,提出了提高开采效率、降低成本、保障作 业安全和减少环境影响的采矿方案。全面概述了矿山的地理环境、矿体赋存情况、开采技术条件, 明确了矿体地质特征、水文地质和工程地质条件,通过系统的岩石力学参数测试,为采矿方法设计 提供科学依据。利用 FLAC3D数值模拟,建立数值计算模型,分析了采场位移规律及采动应力演化 过程,确定了推荐的采矿方案。提出了地表不自然垮塌和地表自然垮塌 2 种主要采矿方案,并对 结构参数、采切工程、凿岩爆破、出矿充填、采场通风和间柱回收等方面进行比较。最终,根据矿岩 的力学性质、开采成本、安全要求和环境影响等因素,推荐了最适合的采矿方法,并就支护技术的 选择提出了建议。

关键词: 采矿方案优选, 数值模拟, 预支护

Abstract: In view of the geological conditions and mining needs of a gold mine in Minxian County, Gansu Province,a mining scheme is proposed to improve mining efficiency,reduce costs,ensure operation safety and reduce environmental impact. The geographical environment,ore body occurrence and mining technical conditions of the mine are comprehensively summarized,and the geological characteristics,hydro‐ geological and engineering geological conditions of the ore body are clarified. Through the systematic rock mechanics parameter test,it provides a scientific basis for the design of mining methods. Using FLAC3D nu‐ merical simulation,the numerical calculation model is established,the displacement law of stope and the evolution process of mining stress are analyzed,and the recommended mining scheme is determined. Two main mining schemes of surface unnatural collapse and surface natural collapse are proposed,comparison of structural parameters,mining and cutting engineering,drilling and blasting,ore filling,stope ventilation and pillar recovery are compared. Finally,according to the mechanical properties of rock,mining cost,safe‐ ty requirements and environmental impact and other factors,the most suitable mining method is recommend‐ ed,and the selection of support technology is proposed.

Key words: mining scheme optimization, numerical simulation, pre-supporting