Research and Application of Reasonable Parameters for Roof Cutting and Pressure Relief of Thick and Hard Roof Fully Mechanized Caving Face

  1. Inner Mongolia Mengtai Buliangou Coal Industry Co.,Ltd.
  • Online:2025-07-25 Published:2025-08-26

摘要: 煤矿常采用人工切顶的方式,降低复杂地质条件下工作面采动对于巷道稳定性的影 响,故确定合理的人工切顶参数尤为重要。以不连沟煤矿 F6218 厚坚硬顶板综放面地质条件为背 景,通过理论计算得出了合理的切顶高度为 45~67.5 m,切顶角度大于-6.63°,采用 FLAC3D模拟了 F6218 主运顺槽不同切顶高度、角度时巷道围岩应力分布规律。结果表明,切顶高度为 52 m,切顶 角度为-5°时,可以保证工作面顶板顺利切落,护巷煤柱内部应力分布较低且均匀,明显达到了切顶 护巷的效果,且切顶高度对切顶效果的影响较切顶角度明显。现场监测表明,煤柱中部存在一定范 围的弹性区域,F6225辅运顺槽围岩变形快速稳定,变形量在可控范围内,切顶护巷效果显著。

关键词: 厚坚硬顶板, 厚煤层, 切顶卸压, 宽煤柱

Abstract: Artificial roof cutting is often used in coal mines to reduce the influence of mining on road‐ way stability under complex geological conditions. Therefore,it is particularly important to determine rea‐ sonable artificial roof cutting parameters. Based on the geological conditions of F6218 fully-mechanized cav‐ ing face with thick and hard roof in Buliangou Coal Mine,the reasonable roof cutting height should be 45~ 67.5 m and the roof cutting angle should be greater than -6.63 ° through theoretical calculation. FLAC3D is used to simulate the stress distribution law of roadway surrounding rock under different roof cutting heights and angles of F6218 main transport crossheading. The results show that when the roof cutting height is 52 m and the roof cutting angle is -5°,the roof of the working face can be smoothly cut off,and the internal stress distribution of the roadway protection coal pillar is low and uniform,which obviously achieves the effect of roof cutting and roadway protection,and the influence of the roof cutting height on the roof cutting effect is more obvious than that of the roof cutting angle. The field monitoring shows that there is a certain range of elastic area in the middle of the coal pillar,and the deformation of the surrounding rock of the F6225 auxilia‐ ry transport roadway is fast and stable. The deformation is within the controllable range,and the effect of roof cutting and roadway protection is remarkable.