深部开采对上部多层复杂采空区的稳定性影响研究

许江明   

  1. 江西浒坑钨业有限公司
  • 出版日期:2025-07-25 发布日期:2025-08-25

Research on the Influence of Deep Mining on the Stability of Upper Multi-layer Complex Goaf

  1. Jiangxi Hukeng Tungsten Industry Co.,Ltd.
  • Online:2025-07-25 Published:2025-08-25

摘要: 某钨矿山经过几十年的开采,-110 m以上中段开采工作已接近完成,但遗留下了大量 复杂的采空区,给矿体开采和井下作业人员的安全带来了隐患。针对上部多层采空区稳定性问题, 开展采空区现场调查和岩石力学性能试验,结合 3DMine、Midas GTS NX软件,应用 FLAC3D有限差分 法对围岩的应力、位移和塑性区分布进行了分析。结果表明:+40,+190 m中段 207# ~208# 勘探线 F11 号矿脉位移量值变化相对较大,应力集中现象明显,为垮塌危险区;+190,+140,+90,+40,-10 m 等 中段 204# ~207# 线 1 号矿脉间柱矿柱塑性区分布范围较大,几乎贯通了整个矿柱,为危险区。根据 研究结果,提出了在+40,+190 m 中段位于 207# ~208# 勘探线的东西向脉组增加位移监测,在+190, +140,+90,+40 m中段 204# ~207# 勘探线 1号矿脉间柱增加应力监测,选择关键区域实施治理措施,为 矿山的安全管理和未来的开采工作提供有力支持,促进矿山的可持续发展。

关键词: 深部开采, 复杂采空区, FLAC3D, 数值模拟, 稳定性

Abstract: After decades of mining in a tungsten mine,the mining work in the middle section above -110 m has been nearly completed,but a large number of complex goafs have been left,which has brought hidden dangers to the mining of ore bodies and the safety of underground workers. In view of the stability of the upper multi-layer goaf,the field investigation and rock mechanical property test of the goaf are carried out. Combined with 3DMine and Midas GTS NX software,the stress,displacement and plastic zone distribu‐ tion of the surrounding rock are analyzed by FLAC3D finite difference method. The results show that the dis‐ placement value of F11 vein in 207# ~208# exploration line F11 in the middle section of +40 m and +190 m changes relatively large,and the stress concentration phenomenon is obvious,which is a dangerous area of collapse. In the middle section of + 190,+ 140,+ 90,+ 40,-10 m,204# ~ 207# line No.1 ore vein pillar pillar plastic zone distribution range is larger,almost through the whole pillar,is a dangerous area. Accord‐ ing to the research results,it is proposed to increase the displacement monitoring in the east-west vein group located in the 207# ~208# exploration line in the middle section of + 40,+ 190 m,and increase the stress monitoring in the middle section of + 190,+ 140,+ 90,+ 40 m in the middle section of 204# ~207# ex‐ ploration line No.1 ore vein pillar,and select the key area to implement the treatment measures,so as to pro‐ vide strong support for the safety management of the mine and the future mining work,and promote the sus‐ tainable development of the mine.

Key words: deep mining, complex goaf, FLAC3D , numerical simulation, stability