现代矿业 ›› 2025, Vol. 41 ›› Issue (07): 240-244.

• 实用技术 • 上一篇    

某方解石矿采场结构参数优化研究

和学衡1,2,3 赵运涛1,2,3 喻六平1,2,3 苗向彪1,2,3   

  1. 1. 中钢集团马鞍山矿山研究总院股份有限公司;2. 华唯金属矿山资源高效循环利用国家工程研究 中心有限公司;3. 金属矿山开采安全与灾害防治全国重点实验室
  • 出版日期:2025-07-25 发布日期:2025-08-27

Study on Optimization of Structural Parameters of Mining Stope of a Calcite Mine

  1. 1. Sinosteel Maanshan General Institute of Mining Research Co.,Ltd.;2. Huawei National Engineering Re‐ search Center of High Efficiency Recycling of Metallic Mineral Resources Co.,Ltd.;3. State Key Laboratory of Metal Mining Safety and Disaster Prevention and Control
  • Online:2025-07-25 Published:2025-08-27

摘要: 为优化某方解石矿阶段矿房法采场结构参数,保障安全高效回采,综合运用理论分析 与数值模拟方法。首先,基于荷载传递交会线法、普氏拱法及厚跨比法对采场顶板稳定性进行理论 计算;同时,结合矿柱强度理论公式与安全系数法,评估了设计开采深度内矿柱的整体稳定性。理论 分析结果表明,原方案14 m采场跨度不足以确保顶板与矿柱系统的安全稳定,存在回采风险,为确保 矿体安全回采,采场跨度应优化至9 m。进而,采用FLAC3D数值模拟软件对理论分析结果进行验证, 模拟结果与理论预测一致,均证实9 m跨度下的结构参数能有效维持采场稳定,实现了对原阶段矿房 法设计参数的优化,为该类矿山安全开采提供了技术依据。

关键词: 阶段矿房法, 顶板稳定性, 数值模拟

Abstract: In order to optimize the stope structure parameters of stage chamber mining method in a calcite mine and ensure safe and efficient mining,theoretical analysis and numerical simulation methods are comprehensively used. Firstly,the stability of the stope roof is theoretically calculated based on the load transfer intersection line method,the Platts arch method and the thickness-span ratio method.At the same time,combined with the theoretical formula of pillar strength and the safety factor method,the overall sta‐ bility of the pillar in the designed mining depth is evaluated. The theoretical analysis results show that the original 14 m stope span is not enough to ensure the safety and stability of the roof and pillar system,and there is a mining risk. In order to ensure the safe mining of the ore body,the stope span should be opti‐ mized to 9 m. Furthermore,FLAC3D numerical simulation software is used to verify the theoretical analysis results. The simulation results are consistent with the theoretical prediction. It is confirmed that the struc‐ tural parameters under 9 m span can effectively maintain the stability of the stope,and the optimization of the design parameters of the original stage room method is realized,which provides a technical basis for the safe mining of this kind of mine.

Key words: stage chamber mining method, roof stability, numerical simulation