某煤矿立井井筒偏斜监测技术和治理措施研究

付瑞学   

  1. 付瑞学
  • 出版日期:2025-07-25 发布日期:2025-08-25

Research on Monitoring Technology and Control Measures of Shaft Deflection in a Coal Mine

  1. Yankuang Xinlu Construction Development Co.,Ltd.
  • Online:2025-07-25 Published:2025-08-25

摘要: 为了解决矿井井筒的偏斜问题,提高矿井稳定性,以营盘壕煤矿的主井和副井为研究 对象,在对矿井地质条件进行分析的基础上,提出了一种简单、便捷的钢丝摆线测量技术,采用导线 测量的方法确定悬垂基准线的平面坐标系,然后再根据钢丝的坐标即可确定监测点位置的井筒坐 标,实现对井筒偏斜情况的持续、稳定监测。根据对井筒偏斜时间特性和空间特性的分析,发现井筒 的偏斜经历了快速增长、偏斜减缓和稳定3个阶段,主井和副井受井下采空区影响,东西方向的偏斜 量均超过了300 mm,存在较大的危险性。通过单孔多层段注浆纠偏技术,能够实现对井筒偏斜的有 效校正,将主井在东西方向上偏斜量降低21.7%,在南北方向上偏斜量降低2.1%;将副井在东西方向 上偏斜量降低 27.7%,在南北方向上偏斜量降低 87.8%,提升了井筒的稳定性,具有较大的应用推广 价值。

关键词: 煤矿立井, 井筒偏斜, 监测, 治理

Abstract: In order to solve the problem of mine shaft deflection and improve the stability of the mine, taking the main shaft and auxiliary shaft of Yingpanhao Coal Mine as the research object,based on the anal‐ ysis of the geological conditions of the mine,a simple and convenient steel wire cycloid measurement tech‐ nology is proposed. The plane coordinate system of the suspended datum line is determined by the method of traverse measurement,and then the shaft coordinate of the monitoring point position can be determined ac‐ cording to the coordinate of the steel wire,and the continuous and stable monitoring of the shaft deflection is realized. According to the analysis of the time and space characteristics of shaft deflection,it is found that the deflection of shaft has experienced three stages of rapid growth,deflection mitigation and stability. The main well and auxiliary well are affected by the underground goaf,and the deflection in the east-west direc‐ tion exceeds 300 mm,which is dangerous. Through the single hole multi-layer grouting correction technolo‐ gy,the effective correction of shaft deviation can be realized,and the deviation of the main shaft in the east�west direction is reduced by 21.7%,and the deviation in the north-south direction is reduced by 2.1%. The deviation of the auxiliary shaft in the east-west direction is reduced by 27.7%,and the deviation in the north-south direction is reduced by 87.8%,which improves the stability of the shaft and has great applica‐ tion and promotion value.

Key words: shaft in coal mine, shaft deflection, monitoring, control