开采扰动下回采巷道围岩失稳及异型锚索加固技术研究

吴鹏亮   

  1. 华阳新材料科技集团有限公司
  • 出版日期:2025-07-25 发布日期:2025-08-27

Study on Surrounding Rock Instability of Mining Roadway and Reinforcement Technology of Special-shaped Anchor Cable under Mining Disturbance

  1. Huayang New Material Technology Group Co.,Ltd.
  • Online:2025-07-25 Published:2025-08-27

摘要: 为解决华阳一矿回采巷道在邻近工作面开采扰动下的支护难题,以该矿151306工作面 回风顺槽支护为工程背景,运用围岩裂隙监测方法,掌握围岩变形失稳特征,分析围岩失稳原因,提 出返修加固方案,并通过工业试验进行验证。矿压监测结果表明:邻近151304工作面采动影响下,原 有锚网索支护条件下151306回风顺槽围岩收敛变形严重,松动破坏范围大,顶板岩层松动破坏深度 为2.8~3.5 m,实体煤帮松动破碎深度为3.0~3.5 m,无法保障巷道围岩稳定。设计采用配套伞状簧片 装置的异型锚索进行二次加固,在151306回风顺槽内张拉试验,表明异型锚索在破碎围岩条件下能 够提供稳定的锚固力(≥200 kN),可有效解决传统锚索在软弱围岩中的锚固难题。设计151306回风 顺槽详细的补强支护方案,并对原有锚杆、锚索进行重新预紧或张拉,围岩变形数据表明,返修加固 后围岩变形速率及变形量较原支护条件下均明显减小,两帮移近量相对于原支护降幅达到77.8%,顶 底板移近量降幅达到69.2%,取得较好围岩控制效果。

关键词: 围岩失稳, 围岩裂隙监测, 异型锚索, 二次加固

Abstract: In order to solve the support problem of the mining roadway in Huayang No.1 Mine under the mining disturbance of the adjacent working face,taking the return air roadway support of the 151306 working face of the mine as the engineering background,the monitoring method of surrounding rock fracture is used to grasp the deformation and instability characteristics of the surrounding rock,and the reasons for the instability of the surrounding rock are analyzed. The repair and reinforcement scheme is proposed and verified by industrial tests. The results of mine pressure monitoring show that under the influence of mining near 151304 working face,the surrounding rock of 151306 return airway under the original anchor net cable support condition has serious convergence deformation and large range of loose failure. The depth of loose failure of roof strata is 2.8~3.5 m,and the depth of loose fracture of solid coal side is 3.0~3.5 m,which can not guarantee the stability of surrounding rock of roadway. The special-shaped anchor cable with umbrella�shaped reed device is designed for secondary reinforcement. The tension test in 151306 return air trough shows that the special-shaped anchor cable can provide stable anchoring force ( ≥ 200 kN ) under the condi‐ tion of broken surrounding rock,which can effectively solve the anchoring problem of traditional anchor ca‐ ble in weak surrounding rock. The detailed reinforcement support scheme of 151306 return air crossheading is designed,and the original bolt and anchor cable are re-prestressed or tensioned. The surrounding rock de‐ formation data show that the deformation rate and deformation of surrounding rock after repair and reinforce‐ ment are significantly lower than those under the original support conditions. Compared with the original sup‐port,the convergence of the two sides is reduced by 77.8 %,and the convergence of the roof and floor is re‐ duced by 69.2 %,which achieves better surrounding rock control effect.

Key words: surrounding rock instability, monitoring of surrounding rock fracture, special-shaped an‐ chor cable, secondary reinforcement