现代矿业 ›› 2022, Vol. 38 ›› Issue (12): 97-.

• 采矿工程 • 上一篇    下一篇

基于多指标评价模型的深部留矿法采场结构参数研究

张柏春1 李俊平2 殷文峰1 常利峰1 肖益盖3   

  1. 1. 陕西西北铅锌集团有限公司;2. 西安建筑科技大学资源工程学院; 3. 中钢集团马鞍山矿山研究总院股份有限公司
  • 出版日期:2022-12-25 发布日期:2023-05-15

Study on Stope Structural Parameters of Deep Shrinkage Method Based on Multi-index Evaluation Model

ZHANG Baichun1 LI Junping2 YIN Wenfeng1 CHANG Lifeng1 XIAO Yigai3   

  1. 1. Shaanxi Northwest Lead and Zinc Group Co.,Ltd.; 2. College of Resources Engineering, Xi'an University of Architecture and Technology; 3.Sinosteel Maanshan General Institute of Mining Research Co.,Ltd.
  • Online:2022-12-25 Published:2023-05-15

摘要: 为了控制东塘子铅锌矿深部开采地压,减少矿石资源损失,基于数值模拟方法,采用 正交试验优化采场结构参数。根据数值模拟结果,选取上下盘顶板位移量,受拉区面积和拉应力 值等作为采场稳定性评价指标,建立多指标综合评价模型,探索采场各结构参数的敏感性,从而指 导采场结构参数优选。研究表明,矿房走向长度对采场稳定性的影响最敏感,其次是顶柱厚度;采 场结构参数初步方案中,间柱厚度为10 m,矿房走向长38 m,顶柱厚8 m,此时上下盘顶板应力集 中明显降低;由于间柱中需要开挖直径2 m的天井,会引起井壁压应力集中,故将间柱厚度增大到 12 m。

关键词: 深部开采, 留矿法采场, 多指标评价, 正交试验

Abstract: In order to control the ground pressure of deep mining in Dongtangzi lead-zinc mine and reduce the loss of ore resources,based on the numerical simulation method,the stope structure parameters were optimized by orthogonal test. According to the numerical simulation results,the displacement of the upper and lower plate roof,the area of the tensile zone and the tensile stress value are selected as the evalu⁃ ation indexes of the stope stability,and a multi-index comprehensive evaluation model is established to ex⁃ plore the sensitivity of the structural parameters of the stope,so as to guide the optimization of the structur⁃ al parameters of the stope. The study shows that the length of room strike is the most sensitive to the stabili⁃ ty of stope,followed by the thickness of top pillar. In the preliminary scheme of stope structural parame⁃ ters,the thickness of the pillar is 10 m,the length of the room is 38 m,and the thickness of the top pillar is 8 m. At this time,the stress concentration of the upper and lower roofs is significantly reduced. Because of the need to excavate a patio with a diameter of 2 m in the pillar,it will cause the compressive stress con⁃ centration of the shaft wall,so the thickness of the pillar is increased to 12 m.

Key words: deep mining, shrinkage stope, multi-index evaluation, orthogonal test