摘要: 在详细介绍一期系统工程的基础上,提出进行深部开拓工程建设,以达到提高产能之目的,提出多方案比较,经过技术经济论证,最终确定皮带斜井运输与一期破碎下部矿仓无缝对接方案,解决了深部矿岩二次提运问题,节省了成本,取得了理想效果,为类似矿山深部开拓工程建设提供了很好范例。
关键词: 深部开拓 皮带斜井 无缝对接方案 方案优选
Abstract: Based on the detailed introduction of the firstphase system engineering,it is proposed to carry out deep exploitation project construction to achieve the purpose of increasing productivity.For this purpose,several schemes are compared.After technical and economic demonstrations,the seamless docking scheme between beltinclined mine transportation and the firstphase crushed lower ore bin is finally determined,which solves the problem of secondary transportation of deep mine,saves costs and achieves ideal results.The construction of deep exploitation project provides a good example for other similar projects.
Key words: deep exploitation,beltinclined mine,seamless docking scheme,scheme optimization
吴纯刚. 李官集铁矿深部矿体开拓工程方案优选实践[J]. 现代矿业, 2020, 36(09): 91-.
WU Chungang. Optimum Practice of Exploitation Project Scheme for Deep Ore Body in Liguanji Iron Mine[J]. Modern Mining, 2020, 36(09): 91-.
/ 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: https://www.xdky.net/CN/
https://www.xdky.net/CN/Y2020/V36/I09/91