现代矿业 ›› 2013, Vol. 29 ›› Issue (11): 14-16+20.
• 采选工程 • 上一篇 下一篇
陈善乐1,2, 汪华君1
出版日期:
发布日期:
Chen Shanle1,2,Wang Huajun1
Online:
Published:
摘要: 为防止或尽可能减轻开采对环境和其他资源的不良影响,取得最佳的经济效益和社会效益,以某矿井的3#、4#煤层开采为基础,讨论了条带开采的工作面布置,利用概率积分法对3#、4#煤层不同开采工艺下的地表沉陷做出预测,并确定了采空区充填参数。
关键词: 建筑群, 复杂断层, 采空区, 充填条带开采
Abstract: In order to prevent or reduce the influene of mining on the environment and other resources as much as possible and obtain the best economic and social benefits.Taking the 3#,4# Coal Seam Mining for instance,the layout working face of strip mining is discussed.The surface subsidence of different mining methods of 3#,4# Coal Seam is predicted by using the probability integral method,and the filling paramters of goaf is determined.
Key words: Building group, Complicated fault, Goaf, Filling strip mining
陈善乐, 汪华君. 建筑群下复杂断层倾斜煤层充填条带开采技术研究[J]. 现代矿业, 2013, 29(11): 14-16+20.
CHEN Shan-Le, WANG Hua-Jun. Research on the Filling Strip Mining Technology of Inclined Coal Seam of Complicated Fault under Building Group[J]. Modern Mining, 2013, 29(11): 14-16+20.
/ 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: https://www.xdky.net/CN/
https://www.xdky.net/CN/Y2013/V29/I11/14